Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 979495

Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations


Dasović, Borna; Galić, Mario; Klanšek, Uroš
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations // Buildings, 9 (2019), 1; 21, 10 doi:10.3390/buildings9010021 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 979495 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations

Autori
Dasović, Borna ; Galić, Mario ; Klanšek, Uroš

Izvornik
Buildings (2075-5309) 9 (2019), 1; 21, 10

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
active BIM ; optimization ; positioning ; time cycle ; tower crane

Sažetak
This paper presents an active building information modeling (BIM) approach for work facilities and the optimal positioning of tower cranes on construction sites with repetitive operations. In this context, the metamorphosis of a passive BIM approach into an active approach is described. Here, the enhancement of the construction-ready BIM model starts with the export of the optimization input parameters, such as the 3D coordinates of the building, perimeter of the construction site, space for feasible solutions, relevant segment of the building with repetitive works, etc. Depending on the complexity of the problem, the user selects a suitable optimization approach and formulates the tower crane positioning optimization problem with the objective of minimizing the total duration of the operation’s cycle. Similarly, according to the model formulation, the user also chooses the optimization tool, including the search algorithm. The final step involves the post- optimal analysis and importing of the optimal solution into the BIM. An application example is demonstrated at the end of the paper to show the advantages of the proposed approach in which the optimization model has significantly improved the initial solution of the crane and depot positions.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski i arhitektonski fakultet Osijek

Profili:

Avatar Url Mario Galić (autor)

Poveznice na cjeloviti tekst rada:

doi www.mdpi.com

Citiraj ovu publikaciju:

Dasović, Borna; Galić, Mario; Klanšek, Uroš
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations // Buildings, 9 (2019), 1; 21, 10 doi:10.3390/buildings9010021 (međunarodna recenzija, članak, znanstveni)
Dasović, B., Galić, M. & Klanšek, U. (2019) Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings, 9 (1), 21, 10 doi:10.3390/buildings9010021.
@article{article, author = {Dasovi\'{c}, Borna and Gali\'{c}, Mario and Klan\v{s}ek, Uro\v{s}}, year = {2019}, pages = {10}, DOI = {10.3390/buildings9010021}, chapter = {21}, keywords = {active BIM, optimization, positioning, time cycle, tower crane}, journal = {Buildings}, doi = {10.3390/buildings9010021}, volume = {9}, number = {1}, issn = {2075-5309}, title = {Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations}, keyword = {active BIM, optimization, positioning, time cycle, tower crane}, chapternumber = {21} }
@article{article, author = {Dasovi\'{c}, Borna and Gali\'{c}, Mario and Klan\v{s}ek, Uro\v{s}}, year = {2019}, pages = {10}, DOI = {10.3390/buildings9010021}, chapter = {21}, keywords = {active BIM, optimization, positioning, time cycle, tower crane}, journal = {Buildings}, doi = {10.3390/buildings9010021}, volume = {9}, number = {1}, issn = {2075-5309}, title = {Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations}, keyword = {active BIM, optimization, positioning, time cycle, tower crane}, chapternumber = {21} }

Časopis indeksira:


  • Current Contents Connect (CCC)
  • Web of Science Core Collection (WoSCC)
    • Science Citation Index Expanded (SCI-EXP)
    • SCI-EXP, SSCI i/ili A&HCI
  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font