Pregled bibliografske jedinice broj: 979495
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations // Buildings, 9 (2019), 1; 21, 10 doi:10.3390/buildings9010021 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 979495 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Active BIM Approach to Optimize Work Facilities and
Tower Crane Locations on Construction Sites with
Repetitive Operations
Autori
Dasović, Borna ; Galić, Mario ; Klanšek, Uroš
Izvornik
Buildings (2075-5309) 9
(2019), 1;
21, 10
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
active BIM ; optimization ; positioning ; time cycle ; tower crane
Sažetak
This paper presents an active building information modeling (BIM) approach for work facilities and the optimal positioning of tower cranes on construction sites with repetitive operations. In this context, the metamorphosis of a passive BIM approach into an active approach is described. Here, the enhancement of the construction-ready BIM model starts with the export of the optimization input parameters, such as the 3D coordinates of the building, perimeter of the construction site, space for feasible solutions, relevant segment of the building with repetitive works, etc. Depending on the complexity of the problem, the user selects a suitable optimization approach and formulates the tower crane positioning optimization problem with the objective of minimizing the total duration of the operation’s cycle. Similarly, according to the model formulation, the user also chooses the optimization tool, including the search algorithm. The final step involves the post- optimal analysis and importing of the optimal solution into the BIM. An application example is demonstrated at the end of the paper to show the advantages of the proposed approach in which the optimization model has significantly improved the initial solution of the crane and depot positions.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
Citiraj ovu publikaciju:
Časopis indeksira:
- Current Contents Connect (CCC)
- Web of Science Core Collection (WoSCC)
- Science Citation Index Expanded (SCI-EXP)
- SCI-EXP, SSCI i/ili A&HCI
- Scopus