Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 936074

Evolving priority rules for resource constrained project scheduling problem with genetic programming


Đumić, Mateja; Šišejković, Dominik; Čorić, Rebeka; Jakobović, Domagoj
Evolving priority rules for resource constrained project scheduling problem with genetic programming // Future generation computer systems, 86 (2018), 211-221 doi:10.1016/j.future.2018.04.029 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 936074 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Evolving priority rules for resource constrained project scheduling problem with genetic programming

Autori
Đumić, Mateja ; Šišejković, Dominik ; Čorić, Rebeka ; Jakobović, Domagoj

Izvornik
Future generation computer systems (0167-739X) 86 (2018); 211-221

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
Genetic programming ; Resource constrained scheduling ; Hyper-heuristics

Sažetak
The main task of scheduling is the allocation of limited resources to activities over time periods to optimize one or several criteria. The scheduling algorithms are devised mainly by the experts in the appropriate fields and evaluated over synthetic benchmarks or real- life problem instances. Since many variants of the same scheduling problem may appear in practice, and there are many scheduling algorithms to choose from, the task of designing or selecting an appropriate scheduling algorithm is far from trivial. Recently, hyper-heuristic approaches have been proven useful in many scheduling domains, where machine learning is applied to develop a customized scheduling method. This paper is concerned with the resource constrained project scheduling problem (RCPSP) and the development of scheduling heuristics based on Genetic programming (GP). The results show that this approach is a viable option when there is a need for a customized scheduling method in a dynamic environment, allowing the automated development of a suitable scheduling heuristic.

Izvorni jezik
Engleski

Znanstvena područja
Računarstvo



POVEZANOST RADA


Ustanove:
Fakultet elektrotehnike i računarstva, Zagreb,
Sveučilište u Osijeku, Odjel za matematiku

Profili:

Avatar Url Domagoj Jakobović (autor)

Avatar Url Rebeka Čorić (autor)

Avatar Url Mateja Đumić (autor)

Poveznice na cjeloviti tekst rada:

Pristup cjelovitom tekstu rada doi

Citiraj ovu publikaciju:

Đumić, Mateja; Šišejković, Dominik; Čorić, Rebeka; Jakobović, Domagoj
Evolving priority rules for resource constrained project scheduling problem with genetic programming // Future generation computer systems, 86 (2018), 211-221 doi:10.1016/j.future.2018.04.029 (međunarodna recenzija, članak, znanstveni)
Đumić, M., Šišejković, D., Čorić, R. & Jakobović, D. (2018) Evolving priority rules for resource constrained project scheduling problem with genetic programming. Future generation computer systems, 86, 211-221 doi:10.1016/j.future.2018.04.029.
@article{article, author = {\DJumi\'{c}, Mateja and \v{S}i\v{s}ejkovi\'{c}, Dominik and \v{C}ori\'{c}, Rebeka and Jakobovi\'{c}, Domagoj}, year = {2018}, pages = {211-221}, DOI = {10.1016/j.future.2018.04.029}, keywords = {Genetic programming, Resource constrained scheduling, Hyper-heuristics}, journal = {Future generation computer systems}, doi = {10.1016/j.future.2018.04.029}, volume = {86}, issn = {0167-739X}, title = {Evolving priority rules for resource constrained project scheduling problem with genetic programming}, keyword = {Genetic programming, Resource constrained scheduling, Hyper-heuristics} }
@article{article, author = {\DJumi\'{c}, Mateja and \v{S}i\v{s}ejkovi\'{c}, Dominik and \v{C}ori\'{c}, Rebeka and Jakobovi\'{c}, Domagoj}, year = {2018}, pages = {211-221}, DOI = {10.1016/j.future.2018.04.029}, keywords = {Genetic programming, Resource constrained scheduling, Hyper-heuristics}, journal = {Future generation computer systems}, doi = {10.1016/j.future.2018.04.029}, volume = {86}, issn = {0167-739X}, title = {Evolving priority rules for resource constrained project scheduling problem with genetic programming}, keyword = {Genetic programming, Resource constrained scheduling, Hyper-heuristics} }

Časopis indeksira:


  • Current Contents Connect (CCC)
  • Web of Science Core Collection (WoSCC)
    • Science Citation Index Expanded (SCI-EXP)
    • SCI-EXP, SSCI i/ili A&HCI
  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font