Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 928427

Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers


Grubišić, Neven; Maglić, Livia
Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers // Athens journal of technology & engineering, 5 (2018), 1; 53-67 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 928427 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers

Autori
Grubišić, Neven ; Maglić, Livia

Izvornik
Athens journal of technology & engineering (2407-9995) 5 (2018), 1; 53-67

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
Berth allocation problem ; Container terminal optimization ; CT logistics ; QC scheduling problem

Sažetak
The objective of this research is the study of container terminals with two separated piers within the same port basin. The main problem is how to optimize the berth and crane allocation and to minimize the overall service time for the vessels and to improve the utilization of the terminal assets. The optimization of the seaside subsystem of the container terminals combines three typical operational problems: ship-to-berth allocation, quay-crane to ship assignment and quay-crane scheduling. Due to their characteristics, they have a high correlation and should be considered together. The problem can become even more complex in the Container terminals with a different layout where quays and berths are not placed in the line or where berths are situated in different piers. In this paper, a specific methodology is presented with a focus on the optimization process. This process consists of three stages namely: initiation, allocation and adjustment. The core of the problem solutions in stage 1 is the execution of crane scheduling problem according to cargo volume and container distribution on the vessel. The result of this stage is three operational scenarios that set out two key variables: duration of the handling process and the number of cranes required. According to the results from stage 1, ship-to-berth assignment and allocation of cranes isexecuted. The practical approach implemented here, targets to high prediction, reliability and efficiency of the operational plans to satisfy the requirements of the shipping companies. This approach requires a fixed number of quay- cranes during the handling operations and high utilization rate of the cranes. The results of the overall optimization have been shown on the few examples

Izvorni jezik
Engleski

Znanstvena područja
Tehnologija prometa i transport, Interdisciplinarne tehničke znanosti



POVEZANOST RADA


Ustanove:
Pomorski fakultet, Rijeka

Profili:

Avatar Url Livia Maglić (autor)

Avatar Url Neven Grubišić (autor)

Citiraj ovu publikaciju:

Grubišić, Neven; Maglić, Livia
Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers // Athens journal of technology & engineering, 5 (2018), 1; 53-67 (međunarodna recenzija, članak, znanstveni)
Grubišić, N. & Maglić, L. (2018) Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers. Athens journal of technology & engineering, 5 (1), 53-67.
@article{article, author = {Grubi\v{s}i\'{c}, Neven and Magli\'{c}, Livia}, year = {2018}, pages = {53-67}, keywords = {Berth allocation problem, Container terminal optimization, CT logistics, QC scheduling problem}, journal = {Athens journal of technology and engineering}, volume = {5}, number = {1}, issn = {2407-9995}, title = {Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers}, keyword = {Berth allocation problem, Container terminal optimization, CT logistics, QC scheduling problem} }
@article{article, author = {Grubi\v{s}i\'{c}, Neven and Magli\'{c}, Livia}, year = {2018}, pages = {53-67}, keywords = {Berth allocation problem, Container terminal optimization, CT logistics, QC scheduling problem}, journal = {Athens journal of technology and engineering}, volume = {5}, number = {1}, issn = {2407-9995}, title = {Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers}, keyword = {Berth allocation problem, Container terminal optimization, CT logistics, QC scheduling problem} }




Contrast
Increase Font
Decrease Font
Dyslexic Font