Managing cost and time in projects of public-use facilities by using the S-curve


Tijanić, Ksenija; Car-Pušić, Diana; Marović, Ivan
Managing cost and time in projects of public-use facilities by using the S-curve // Conference proceedings of People, Buildings and Environment 2016, an international scientific conference / Korytarova, Jana ; Serrat, Carles ; Hanak, Tomaš ; Vankova, Lucie (ur.) (ur.).
Brno: Faculty of Civil Engineering, Brno University of Technology, 2016. str. 185-196 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 847062 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Managing cost and time in projects of public-use facilities by using the S-curve

Autori
Tijanić, Ksenija ; Car-Pušić, Diana ; Marović, Ivan

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
Conference proceedings of People, Buildings and Environment 2016, an international scientific conference / Korytarova, Jana ; Serrat, Carles ; Hanak, Tomaš ; Vankova, Lucie (ur.) - Brno : Faculty of Civil Engineering, Brno University of Technology, 2016, 185-196

Skup
International Scientific Conference "People, Buildings and Environment 2016"

Mjesto i datum
Luhačovice, Češka Republika, 29.09.2016. - 01.10.2016

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Public facility with social purpose ; Reallocation ; S-curve ; Successful project implementation

Sažetak
The paper presents the relation between the planned duration and costs for a project of reconstructing an overage public structure to become a public facility with social purpose. The aim of the paper was development of a management model for such projects so that they could be successfully carried out in terms of cost and time. The selected example presents the methodology of time and cost relation in the project. The selected tool for connecting the mentioned project parameters is the S- curve. The S-curve is obtained through the planning process in several steps which include creation of project WBS (work breakdown structure), cost estimate and progress chart (Gantt chart). The obtained S- curve is the basis which later serves as the indicator for project performance success. Aberrations from the planned values can be detected by comparisons, monitoring and control which enables duly reaction and undertaking specific correction measures. A quick information about key trends of the project and effects of specific decisions and measures on project cost and duration is obtained. The developed model can be applied to projects of reconstructing and reallocating public structures into public facilities with social purpose with similar technical and functional characteristics such as: size of the surface, number of floors, construction type, purpose and other.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo, Projektni menadžment



POVEZANOST RADA


Citiraj ovu publikaciju:

Tijanić, Ksenija; Car-Pušić, Diana; Marović, Ivan
Managing cost and time in projects of public-use facilities by using the S-curve // Conference proceedings of People, Buildings and Environment 2016, an international scientific conference / Korytarova, Jana ; Serrat, Carles ; Hanak, Tomaš ; Vankova, Lucie (ur.) (ur.).
Brno: Faculty of Civil Engineering, Brno University of Technology, 2016. str. 185-196 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Tijanić, K., Car-Pušić, D. & Marović, I. (2016) Managing cost and time in projects of public-use facilities by using the S-curve. U: Korytarova, J., Serrat, C., Hanak, T. & Vankova, L. (ur.)Conference proceedings of People, Buildings and Environment 2016, an international scientific conference.
@article{article, author = {Tijani\'{c}, Ksenija and Car-Pu\v{s}i\'{c}, Diana and Marovi\'{c}, Ivan}, year = {2016}, pages = {185-196}, keywords = {Public facility with social purpose, Reallocation, S-curve, Successful project implementation}, title = {Managing cost and time in projects of public-use facilities by using the S-curve}, keyword = {Public facility with social purpose, Reallocation, S-curve, Successful project implementation}, publisher = {Faculty of Civil Engineering, Brno University of Technology}, publisherplace = {Luha\v{c}ovice, \v{C}e\v{s}ka Republika} }
@article{article, author = {Tijani\'{c}, Ksenija and Car-Pu\v{s}i\'{c}, Diana and Marovi\'{c}, Ivan}, year = {2016}, pages = {185-196}, keywords = {Public facility with social purpose, Reallocation, S-curve, Successful project implementation}, title = {Managing cost and time in projects of public-use facilities by using the S-curve}, keyword = {Public facility with social purpose, Reallocation, S-curve, Successful project implementation}, publisher = {Faculty of Civil Engineering, Brno University of Technology}, publisherplace = {Luha\v{c}ovice, \v{C}e\v{s}ka Republika} }




Contrast
Increase Font
Decrease Font
Dyslexic Font