Cost Effective Heat Exchangers Network of Total Site Heat Integration
Cost Effective Heat Exchangers Network of Total Site Heat Integration // Chemical Engineering Transactions / Sabev Varbanov, Petar ; Liew, Peng-Yen ; Yong, Jun-Yow ; Klemeš, Jiří Jaromír ; Lam, Hon Loong (ur.).
Prag, Češka Republika: Italian Association of Chemical Engineering (AIDIC), 2016. str. 541-546 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 844402 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Cost Effective Heat Exchangers Network of Total Site Heat Integration
Autori
Boldyryev, Stanislav ; Krajačić, Goran ; Duić, Neven
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Chemical Engineering Transactions
/ Sabev Varbanov, Petar ; Liew, Peng-Yen ; Yong, Jun-Yow ; Klemeš, Jiří Jaromír ; Lam, Hon Loong - : Italian Association of Chemical Engineering (AIDIC), 2016, 541-546
ISBN
978-88-95608-42-6
Skup
PRES 2016
Mjesto i datum
Prag, Češka Republika, 27.08.2016. - 31.08.2016
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Heat Exchangers; process integration; energy efficiency improvement; total site
Sažetak
This paper deals with selection of optimum amount heat to be recovered during Total Site integration and utility targets for external heating, cooling, refrigerating etc. The methodology provides the calculation of minimum capital investment during heat integration of industrial site. It uses heat transfer area targets, utility distribution with overall cost of retrofit. Heat transfer area is calculated for different regions with use of intermediate utility and direct heating and cooling. Minimal temperature difference between Total Site profiles is analysed. Minimum of total heat transfer area for Total Site recovery is calculated for array of minimal temperature differences. The utility consumption, numbers of units and material of equipment are analysed too and minimum total cost for retrofit project of site recovery system is calculated. The case study shows heat recovery improvement on 1.94 MW. Site heating demands is reduced on 37.3 % and cooling capacity reduction is 39.6 %. The implementation of retrofit EUR 777, 474 and payback time is 11.96 months.
Izvorni jezik
Engleski
Znanstvena područja
Strojarstvo
POVEZANOST RADA
Projekti:
120-1201918-1920 - Racionalno skladištenje energije za održivi razvoj energetike (Duić, Neven, MZOS ) ( CroRIS)
Ustanove:
Fakultet strojarstva i brodogradnje, Zagreb