Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 819521

Resource Time Schedule Improvement During Preparation


Vidaković, Držislav
Resource Time Schedule Improvement During Preparation // Proceedings of the International Conference Techsta 2004 Technology for Sustainable Development in Building Industry / Parova, Maria (ur.).
Prag, 2004. str. 32-37 (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 819521 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Resource Time Schedule Improvement During Preparation

Autori
Vidaković, Držislav

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
Proceedings of the International Conference Techsta 2004 Technology for Sustainable Development in Building Industry / Parova, Maria - Prag, 2004, 32-37

ISBN
80-01-02 916-6

Skup
4th International Conference Techsta 2004 Technology for Sustainable Development in Building Industry

Mjesto i datum
Prag, Češka Republika, 18.02.2004. - 20.02.2004

Vrsta sudjelovanja
Poster

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Planning; time schedule; resource; measures; improving

Sažetak
Planning is an exceptionally important part of preparation that is a basis for all following parameters of site organisation project. A resource plan is usually overlooked in practice, limiting optimalisational procedures to achieving an acceptable building duration. That is because one overoptimistically assumes that time schedule will balance during the completion of the project at the building site. Such plans cannot be realistically used and are easily broken. The article presents an overview of different quality characteristics attached to resource – work force and machines - time schedule (bar graphs). Known procedures and measurements for the enhancement of these characteristics are discussed as well as some innovative ways of improving resource time schedule during plan calculations for the site organisation project (wining the bid!). For a definitive improvement a combination of mentioned procedures is suggested.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski i arhitektonski fakultet Osijek

Profili:

Avatar Url Držislav Vidaković (autor)


Citiraj ovu publikaciju:

Vidaković, Držislav
Resource Time Schedule Improvement During Preparation // Proceedings of the International Conference Techsta 2004 Technology for Sustainable Development in Building Industry / Parova, Maria (ur.).
Prag, 2004. str. 32-37 (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Vidaković, D. (2004) Resource Time Schedule Improvement During Preparation. U: Parova, M. (ur.)Proceedings of the International Conference Techsta 2004 Technology for Sustainable Development in Building Industry.
@article{article, author = {Vidakovi\'{c}, Dr\v{z}islav}, editor = {Parova, M.}, year = {2004}, pages = {32-37}, keywords = {Planning, time schedule, resource, measures, improving}, isbn = {80-01-02 916-6}, title = {Resource Time Schedule Improvement During Preparation}, keyword = {Planning, time schedule, resource, measures, improving}, publisherplace = {Prag, \v{C}e\v{s}ka Republika} }
@article{article, author = {Vidakovi\'{c}, Dr\v{z}islav}, editor = {Parova, M.}, year = {2004}, pages = {32-37}, keywords = {Planning, time schedule, resource, measures, improving}, isbn = {80-01-02 916-6}, title = {Resource Time Schedule Improvement During Preparation}, keyword = {Planning, time schedule, resource, measures, improving}, publisherplace = {Prag, \v{C}e\v{s}ka Republika} }




Contrast
Increase Font
Decrease Font
Dyslexic Font