Pregled bibliografske jedinice broj: 817280
New bridges for sustainable development of the Adriatic coast in Croatia
New bridges for sustainable development of the Adriatic coast in Croatia // Proceedings of the 8th New York City Bridge Conference / Mahmoud, Khaled (ur.).
New York (NY): Bridge Engineering Association, 2015. str. 101-113 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 817280 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
New bridges for sustainable development of the Adriatic coast in Croatia
Autori
Radić, Jure ; Šavor, Zlatko ; Kušter Marić, Marija
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of the 8th New York City Bridge Conference
/ Mahmoud, Khaled - New York (NY) : Bridge Engineering Association, 2015, 101-113
Skup
New York City Bridge Conference(8 : 2015)
Mjesto i datum
Sjedinjene Američke Države, 24.08.2015. - 25.08.2015
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
arch bridge ; movable bridge ; cable-stayed bridge ; beam bridge ; span extradosed bridge
Sažetak
Croatia is a land of more than a thousand islands requiring construction of many large bridges in an aggressive maritime environment but also in a zone of large seismicity. After a short review of durability issues of the large arch bridges built in the 20th century, design of two new bridges on the Croatian Adriatic coast is presented in the paper. The new movable Mainland – Čiovo Bridge is currently under construction to relieve traffic congestion on the existing movable bridge. The Mainland – Pelješac Bridge has been intensively planned in the last decade to provide the fixed road link between the whole of Croatia. The main design of the bridge was completed and building permit was obtained. The construction of the bridge began in 2007, but it was slowed down and finally stopped in 2012 due to financial problems. Two alternative bridge solutions were proposed in the new preliminary design, a continuous steel beam bridge and a multi-span extradosed semi-integral bridge with hybrid deck, in order to attempt to reduce costs.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Ustanove:
Građevinski fakultet, Zagreb