Methodology for Allocation of Remote Controlled Switches Within Long Term Medium Voltage Distribution Network Planning
Methodology for Allocation of Remote Controlled Switches Within Long Term Medium Voltage Distribution Network Planning // CIRED 2015 - The 23rd International Conference and Exhibition on Electricity Distribution
Lyon, Francuska, 2015. (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 807707 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Methodology for Allocation of Remote Controlled Switches Within Long Term Medium Voltage Distribution Network Planning
Autori
Baričević, Tomislav ; Skok, Minea ; Dudjak, Viktorija
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
CIRED 2015 - The 23rd International Conference and Exhibition on Electricity Distribution
/ - , 2015
Skup
CIRED 2015 - The 23rd International Conference and Exhibition on Electricity Distribution
Mjesto i datum
Lyon, Francuska, 15.06.2015. - 18.06.2015
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
distribution network planning; reliability; allocation of remote controlled switches
(planiranje distribucijskih mreža; pouzdanost; lociranje daljinski upravljivih rastavnih sklopki)
Sažetak
Reliability, as a measure of quality of supply of the customers, is one of the most important criteria in medium voltage distribution network planning. This paper provides description of reliability analyses based on application of the exact continuity of supply indicators related to expected values of the number (SAIFI) and duration (SAIDI) of power supply interruptions. For three defined zones (urban, mixed and rural) quality standards, defined as minimum values that have to be achieved in specific sections of the network, are applied. When defining the quality standards, both the values achieved in more developed countries, as well as realistic goals influenced by the current status of Croatian networks, have to be taken into account. Taking into consideration relatively high requirements regarding the input data, the applied methodology is limited to the most important indicators: the average number and the average duration of long power supply interruptions by the network user. Finally, the economic assessment of investments is provided based on the benefit/cost ratio methodology.