Pregled bibliografske jedinice broj: 784417
Total Site Integration for Coke Oven Plant
Total Site Integration for Coke Oven Plant // Chemical Engineering transactions, 35 (2013), 235-240 doi:10.3303/CET1335039 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 784417 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Total Site Integration for Coke Oven Plant
Autori
Ulyev, Leonid, M ; Kapustenko, Petro, A. ; Vasilyev, Mikhail, A. ; Boldyryev, Stanislav, A.
Izvornik
Chemical Engineering transactions (1974-9791) 35
(2013);
235-240
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
Coke Production; Process Integration; Total Site Analisys; Energy Efficiency
Sažetak
The process of benzene distillation and process of coal tar distillation being typical for East European countries is analyzed in this paper. The pinch analysis method was selected to perform a reconstruction project. According to principles of pinch analysis, new network diagrams are designed and capacity of heatexchange equipment is calculated. The using of «Total Site Profiles» showed the feasibility of heat pump integration. Heat pump integration allowed to reduce the external hot utilities usage on 368 kW and cold utilities usage on 368 kW. This project let to decrease the external hot utilities usage on 23 % and cold utilities usage on 24, 13 %, and also offered the way of step-by-step retrofit of the plant.
Izvorni jezik
Engleski
Znanstvena područja
Kemijsko inženjerstvo, Strojarstvo
POVEZANOST RADA
Projekti:
120-1201918-1920 - Racionalno skladištenje energije za održivi razvoj energetike (Duić, Neven, MZOS ) ( CroRIS)
Ustanove:
Fakultet strojarstva i brodogradnje, Zagreb
Citiraj ovu publikaciju:
Časopis indeksira:
- Scopus