Pregled bibliografske jedinice broj: 784396
Process Integration for Bromine Plant
Process Integration for Bromine Plant // Chemical Engineering transactions, 39 (2014), 1423-1428 doi::10.3303/CET1439238 (podatak o recenziji nije dostupan, članak, znanstveni)
CROSBI ID: 784396 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Process Integration for Bromine Plant
Autori
Boldyryev, Stanislav ; Varbanov, Petar, Sabev
Izvornik
Chemical Engineering transactions (1974-9791) 39
(2014);
1423-1428
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
Bromine; Sodium bromide; Total Site Analysis; Pinch Analysis; Heat recovery; Heat exchangers network; Chemical Industry
Sažetak
This paper deals with analysis of energy consumption of Ukrainian bromine plant. Process integration allows reducing the energy consumption on 1.5 MW by heat recovery. It is achieved by improvement of recuperative heat exchangers network. Additionally heat recovery may be increased by multistage evaporation of sodium bromide and ferrous chloride. Increase the heat recovery leads utility reduction. This is not only heating and cooling duty but also power pumping and pipe heat losses. The investment for retrofit project is about 757 100 € and payback period about 2 years.
Izvorni jezik
Engleski
Znanstvena područja
Kemijsko inženjerstvo, Strojarstvo
POVEZANOST RADA
Projekti:
120-1201918-1920 - Racionalno skladištenje energije za održivi razvoj energetike (Duić, Neven, MZOS ) ( CroRIS)
Ustanove:
Fakultet strojarstva i brodogradnje, Zagreb
Profili:
Stanislav Boldyryev
(autor)