Comparison of Predicted and Actual Conditions of the Rock Mass in the Tunnel Stražina
Comparison of Predicted and Actual Conditions of the Rock Mass in the Tunnel Stražina // Rock Engineering and Rock Mechanics: Structures in and on Rock Masses / Alejano, Leandro R. ; Perucho, Aurea ; Olalla, Claudio ; Jimenez, Rafael (ur.).
London : Delhi: Taylor & Francis, 2014. str. 757-762 (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 761241 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Comparison of Predicted and Actual Conditions of the Rock Mass in the Tunnel Stražina
Autori
Ravnjak, Katarina ; Grget, Goran ; Kovačević, Meho Saša
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Rock Engineering and Rock Mechanics: Structures in and on Rock Masses
/ Alejano, Leandro R. ; Perucho, Aurea ; Olalla, Claudio ; Jimenez, Rafael - London : Delhi : Taylor & Francis, 2014, 757-762
ISBN
978-1-315-74952-5
Skup
Eurock 2014
Mjesto i datum
Vigo, Španjolska, 27.05.2014. - 29.05.2014
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Tunnel; RMR; Monitoring
Sažetak
The aim of this paper is to examine and compare the results of engineering geological exploration works in the design phase and during the construction of tunnel Stražina. Tunel Stražina is located near the city of Omiš on Zagreb-Split-Dubrovnik highway in Croatia. The interactive design method was applied in the tunnel design. This methodology integrates the empirical, rational and observational approaches in the geotechnical design of the tunnel. It allows for the thorough and comprehensive overview and problem solving during the construction. In addition, it minimizes the errors that may occur due to the limitations of each individual approach. Predicted underground excavation support solutions were done based on site investigation activities and other bases using the empirical and rational approaches. Geomechanical and Q classification were performed as a part of the empirical approach. Engineering-geological tunnel mapping was done during the excavation activities as a part of the geotechnical monitoring. Verification of the tunnel support system during the construction phase was done using the actual data obtained from the engineering-geological mapping and the monitoring. Thus, the actual rock mass quality along the tunnel was determined and the tunnel underground excavation support measures were optimized. Due to the complex conditions present in the rock mass, the discrepancy between estimated and actual rock mass conditions can hardly be avoided, and likewise, a certain amount of discrepancy between the predicted and actual support systems is also to be ex-pected. The interaction of site investigation, design and construction, in addition to introducing the risk analy-sis, is essential for a more rational, safer and more economical construction. Development of methods and procedures for the preparation and control for each of the phases is important for a successful operation of each participant performing a completion of a particular phase, as well as for the project investor.
Izvorni jezik
Engleski
Znanstvena područja