Pregled bibliografske jedinice broj: 6568
Demolition of Reinforced Concrete Bridges During Reconstruction of the Motorway Zagreb-Krapina
Demolition of Reinforced Concrete Bridges During Reconstruction of the Motorway Zagreb-Krapina // Proceedings of the Twenty-Thired Annual Conference On Explosives and Blasting Technique / International Society of Explosives Engineers (ur.).
Las Vegas (NV): ISEE, 29100 Aurora Road, Cleveland, Ohio, USA, 1997. str. 133-144 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 6568 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Demolition of Reinforced Concrete Bridges During Reconstruction of the Motorway Zagreb-Krapina
Autori
Ester, Zvonimir ; Cirković, Goran ; Krsnik, Josip
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of the Twenty-Thired Annual Conference On Explosives and Blasting Technique
/ International Society of Explosives Engineers - Las Vegas (NV) : ISEE, 29100 Aurora Road, Cleveland, Ohio, USA, 1997, 133-144
Skup
Twenty-Third Annual Conference On Explosives and Blasting Technique
Mjesto i datum
Las Vegas (NV), Sjedinjene Američke Države, 02.02.1997. - 05.02.1997
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
miniranje; rušenje objekata; seizmički utjecaji miniranja
(blasting; demolition of buildings; seizmic effects of blasting)
Sažetak
During the reconstruction of the motorway Zagreb-Krapina three reinforced concrete bridges were demolished, their width not being adequate for the new motorway
Demolition of the three bridges was carried out by blasting as the traffic cut on the motorway and the railway was allowed to be maximally 4 houres. During this period the demolished bridge had to be removed. Therefore, very tiny granulation was requested suitable for loading and not endangering the surrounding structures. Before each of three main blastings, trial blastings were carried out including the seizmic measurements registering the seizmic effects. The nearest residential building was at the distance of less than 30 m from the place of blasting. Additional difficulty was the fact that by each of the three bridges there is the new bridge, the minimal distance between the old and the new bridge being 30 cm. As each of the bridges is of different construction and of various thickness, particular blasting technique has been prepared for each one of the bridges.