Pregled bibliografske jedinice broj: 653277
Limitations in the design of ancillary service markets imposed by communication network delays
Limitations in the design of ancillary service markets imposed by communication network delays // Proceedings the 7th IEEE International Conference on the European Energy Market 2010
Madrid, Španjolska, 2010. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 653277 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Limitations in the design of ancillary service markets imposed by communication network delays
Autori
Hermans, R.M. ; Jokić, Andrej ; Bosch, P.P.J. van den ; Frunt, J. ; Kamphuis, l.G. ; Warmer, C.J.
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings the 7th IEEE International Conference on the European Energy Market 2010
/ - , 2010
Skup
IEEE International Conference on the European Energy Market 2010
Mjesto i datum
Madrid, Španjolska, 2010
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
ancillary services; real-time balancing; pricebased control; two-sided markets; decentralized solutions; smartgrid technologies
Sažetak
Real-time balancing of the European electricity grid will become increasingly dependent on market-based control mechanisms that are enabled by connecting millions of prosumers to an open communication network. The use of communication systems inevitably introduces delays in the energy balancing control loop, which could endanger market operation and stability of the electricity grid. By investigating the interaction between price-based control algorithms for real-time balancing and information and communication technology, we aim to provide systematic design rules for unrestricted ancillary service markets.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika, Temeljne tehničke znanosti