Pregled bibliografske jedinice broj: 642542
Assessment of Investment in Hydropower Plants on the River Sava
Assessment of Investment in Hydropower Plants on the River Sava // 8th International Conference on Deregulated Electricity Market Issues in South-Eastern Europe
Cavtat, Hrvatska, 2013. (predavanje, domaća recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 642542 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Assessment of Investment in Hydropower Plants on the River Sava
Autori
Ilak, Perica ; Krajcar, Slavko
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Skup
8th International Conference on Deregulated Electricity Market Issues in South-Eastern Europe
Mjesto i datum
Cavtat, Hrvatska, 24.09.2013. - 25.09.2013
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Domaća recenzija
Ključne riječi
Sava river; City of Zagreb; cascaded hydropower plant model; optimization; net present value; internal rate of return; capacity factor; linear programming
Sažetak
In this study an assessment of investments in cascaded run-of-river hydropower plants is considered. The objective of this work is to maximize the net present value and internal rate of return of the cascade from selling energy. Because of the stochastic nature of river flows, flow duration curve is constructed to take into account hydropower plant capacity factor, important for the assessment of investment. Proposed mixed-integer linear programming model is flexible and accounts for nonlinear three- dimensional (3-D) relationship between the produced power, the discharged water, and the head of the associated reservoir. Sava river stretch from border with Slovenia to city of Sisak is considered.
Izvorni jezik
Engleski
Znanstvena područja
Ekonomija
POVEZANOST RADA
Projekti:
036-0361590-1591 - Razvoj alata za analizu tržišta električne energije (Krajcar, Slavko, MZO ) ( CroRIS)
Ustanove:
Fakultet elektrotehnike i računarstva, Zagreb