Pregled bibliografske jedinice broj: 598644
Mošćenička Draga Investigating Sight – Hydrology and Coastal Processes
Mošćenička Draga Investigating Sight – Hydrology and Coastal Processes // 2nd PROJECT WORKSHOP OF THE MONITORING AND ANALYSES FOR DISASTER MITIGATION OF LANDSLIDES, DEBRIS FLOW AND FLOODS, BOOK OF ABSTRACTS. / Ožanić, Nevenka ; Arbanas, Željko ; Mihalić, Snježana ; Marui, Hideaki (ur.).
Rijeka: Sveučilište u Rijeci, 2012. str. 27-27 (predavanje, međunarodna recenzija, sažetak, znanstveni)
CROSBI ID: 598644 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Mošćenička Draga Investigating Sight – Hydrology and Coastal Processes
Autori
Ružić, Igor ; Benac, Čedomir
Vrsta, podvrsta i kategorija rada
Sažeci sa skupova, sažetak, znanstveni
Izvornik
2nd PROJECT WORKSHOP OF THE MONITORING AND ANALYSES FOR DISASTER MITIGATION OF LANDSLIDES, DEBRIS FLOW AND FLOODS, BOOK OF ABSTRACTS.
/ Ožanić, Nevenka ; Arbanas, Željko ; Mihalić, Snježana ; Marui, Hideaki - Rijeka : Sveučilište u Rijeci, 2012, 27-27
ISBN
978-953-6953-26-4
Skup
2nd PROJECT WORKSHOP: MONITORING AND ANALYSES FOR DISASTER MITIGATION OF LANDSLIDES, DEBRIS FLOW AND FLOODS
Mjesto i datum
Rijeka, Hrvatska, 15.12.2011. - 17.12.2011
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
torrential flow; flood; hydrological research
Sažetak
In this paper are presented Mošćenička Draga investigating sight ongoing hydrological research and sight description. Mošćenička Draga is one investigating sights in the Croatian - Japanese international project - Risk identification and planning of land-use to mitigate the risk of landslides and flash floods in Croatia. Mošćenička Draga is a small village, situated 15 km SW from Rijeka. It is a famous because of its gravel beach. Gravel beach is formed on the torrential flow mouth by a deposition of torrential sediments. Torrential basin area is about 11 km2, average basin slope is very high 47%. Highest catchment point is about 1300 meters. Rainfall intensities are very high. Predicted maximum discharge is 90 m3/s, and that is regulated torrential stream design discharge. Because of catchment and rainfall characteristics runoffs are very intensive and floods were often in the past. Because of that flood defence works have been designed on torrential flow Mošćenička Draga. Today is a great probability of occurrence flooding because of sediment dam fulfilment and potential landslide in the middle of the torrential flow. This Landslide can cause the formation of natural dam, and water can destroyed those dams. Mošćenička Draga torrential flow mouth increases flash flood risks, because of its improper construction. Beside this, the Mediterranean Sea level rise and more frequent and larger magnitude storms in the future are expected to cause frequent occurrence of extremely high sea levels which will result in additional flood risk increase.
Izvorni jezik
Engleski
Znanstvena područja
Geologija, Rudarstvo, nafta i geološko inženjerstvo
POVEZANOST RADA
Projekti:
114-0822695-2568 - Procjena, umanjivanje i upravljanje geološkim hazardom u području Kvarnera (Benac, Čedomir, MZOS ) ( CroRIS)
119-1191152-1169 - Recentni sedimenti i fosilni okoliši jadranskog priobalja (Juračić, Mladen, MZOS ) ( CroRIS)
Ustanove:
Građevinski fakultet, Rijeka,
Prirodoslovno-matematički fakultet, Zagreb