Comparing the Inspection Results with On-line Life Assessment on a Boiler Drum
Comparing the Inspection Results with On-line Life Assessment on a Boiler Drum // Intelligent Software Systems in Inspection and Life Management of Power and Process Plant / Y.J.Kim (ur.).
Seoul: SAFE, Sungkyunkwan University, 300 Chunchum-dong, Jangan-gu,Suw, 1999. str. 179-184 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 56213 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Comparing the Inspection Results with On-line Life Assessment on a Boiler Drum
Autori
Gruden, Mihael ; Kurent, Vinko ; Ober, Meinhard ; Prelec, Zmagoslav.
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Intelligent Software Systems in Inspection and Life Management of Power and Process Plant
/ Y.J.Kim - Seoul : SAFE, Sungkyunkwan University, 300 Chunchum-dong, Jangan-gu,Suw, 1999, 179-184
Skup
SMiRT Post Conference Seminar 13 SAFE 99
Mjesto i datum
Gyeongju, Republika Koreja, 20.08.1999. - 24.08.1999
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Life assessment; boiler drum; power plant
Sažetak
The life assessment on all boiler components is based on data available at the beginning of the design phase. Most remaining life assessment are made based on cycling calculations and using the assumptions laid out in guidelines and regulations. Regular inspection intervals in TE Trbovlje over the past 40 000 hours have provided data to make an attempt to perform the calculations backwards to the basic material properties and safety margins. The issue and choice of inspection data, comparison with the results from the ALIAS monitoring system will be demonstrated on the case of the drum assessment. The ALIAS system will be used for the safe prediction of the remaining operation time to be within the limits of the prediction made in this paper. The ALIAS system is a scalable solution for all sizes of power plants and its introduction will enable life assessment of all relevant components of power plant. It will be shown that with such an assessment the targeted life prolongation of 80 000 hours can be safely reached.
Izvorni jezik
Engleski
Znanstvena područja
Strojarstvo