Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault


Filipović-Grčić, Božidar; Uglešić, Ivo; Milardić, Viktor; Ivanković, Igor
Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault // 16th International Symposium on High Voltage Engineering, Cape Town, South Africa, 24-28.08.2009.
Cape Town, 2009. (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 539674 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault

Autori
Filipović-Grčić, Božidar ; Uglešić, Ivo ; Milardić, Viktor ; Ivanković, Igor

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
16th International Symposium on High Voltage Engineering, Cape Town, South Africa, 24-28.08.2009. / - Cape Town, 2009

Skup
16th International Symposium on High Voltage Engineering, Cape Town, South Africa, 24-28.08.2009.

Mjesto i datum
Cape Town, Južnoafrička Republika, 24.08.2009. - 28.08.2009

Vrsta sudjelovanja
Poster

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
transient recovery voltage; short-line fault; electric arc model

Sažetak
Transient recovery voltage (TRV) is calculated according to the IEC standards and using the EMTP- ATP software. Modelling of electric arc for the SF6 circuit breaker is presented. Influence of grading capacitors and line bay disposition on the TRV waveform on the side of the line in a 400 kV substation is analyzed for the short-line fault (SLF) conditions. Fault location at which the rate of rise of recovery voltage (RRRV) is the highest was determined using the EMTP-ATP simulations. Results obtained according to the IEC standards and using the EMTP-ATP are compared.

Izvorni jezik
Engleski

Znanstvena područja
Elektrotehnika



POVEZANOST RADA


Projekti:
036-0361590-1578 - Udovoljavanje zahtjeva zaštite okoliša u visokonaponskom sustavu (Uglešić, Ivo, MZO ) ( CroRIS)

Ustanove:
Fakultet elektrotehnike i računarstva, Zagreb


Citiraj ovu publikaciju:

Filipović-Grčić, Božidar; Uglešić, Ivo; Milardić, Viktor; Ivanković, Igor
Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault // 16th International Symposium on High Voltage Engineering, Cape Town, South Africa, 24-28.08.2009.
Cape Town, 2009. (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Filipović-Grčić, B., Uglešić, I., Milardić, V. & Ivanković, I. (2009) Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault. U: 16th International Symposium on High Voltage Engineering, Cape Town, South Africa, 24-28.08.2009..
@article{article, author = {Filipovi\'{c}-Gr\v{c}i\'{c}, Bo\v{z}idar and Ugle\v{s}i\'{c}, Ivo and Milardi\'{c}, Viktor and Ivankovi\'{c}, Igor}, year = {2009}, keywords = {transient recovery voltage, short-line fault, electric arc model}, title = {Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault}, keyword = {transient recovery voltage, short-line fault, electric arc model}, publisherplace = {Cape Town, Ju\v{z}noafri\v{c}ka Republika} }
@article{article, author = {Filipovi\'{c}-Gr\v{c}i\'{c}, Bo\v{z}idar and Ugle\v{s}i\'{c}, Ivo and Milardi\'{c}, Viktor and Ivankovi\'{c}, Igor}, year = {2009}, keywords = {transient recovery voltage, short-line fault, electric arc model}, title = {Transient recovery voltage of 400 kV SF6 circuit breaker when clearing short-line fault}, keyword = {transient recovery voltage, short-line fault, electric arc model}, publisherplace = {Cape Town, Ju\v{z}noafri\v{c}ka Republika} }




Contrast
Increase Font
Decrease Font
Dyslexic Font