Integrating Engineering Design through Temporal Coordination


Zerjav, Vedran; Hartmann, Timo
Integrating Engineering Design through Temporal Coordination // EPOC 2011 - Working Paper Series: Proceedings of the Engineering Project Organization Conference / Paul Chinowsky, Ray Levitt (ur.).
Jezero Tahoe (CA), Sjedinjene Američke Države: Engineering Project Organization Society, 2010. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 532033 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Integrating Engineering Design through Temporal Coordination

Autori
Zerjav, Vedran ; Hartmann, Timo

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
EPOC 2011 - Working Paper Series: Proceedings of the Engineering Project Organization Conference / Paul Chinowsky, Ray Levitt - : Engineering Project Organization Society, 2010

Skup
EPOC 2011 - The Engineering Project Organization Society

Mjesto i datum
Jezero Tahoe (CA), Sjedinjene Američke Države, 04.11.2010. - 06.11.2010

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Construction design integration; temporal aspects in organizations; concurrent engineering; single case study.

Sažetak
An increasing number of complex construction projects use fragmented organizations to deliver the design. The production of design in such fragmented project organizations requires tremendous coordination efforts to integrate the final product. This paper takes a temporal perspective on a number of challenges that occur on the project level as a consequence of fragmentation in engineering design. We present empirical findings from a fragmented fast-track railway engineering design project and conclude that temporal coordination is one of the key tools for design integration. By applying relevant theoretical concepts to the case study findings, we begin analyzing the outline of a model for temporally organizing fragmented engineering design. First, we confirm the previously reported notion of subjective sense of timing in organizations. We then identify two generic strategies for temporal coordination of design tasks: concurrent coordination and delayed coordination. Concurrent coordination is supported by the integrated design approach and increases complexity of the design process, whereas delayed coordination is supported by the sequential approach to design and decreases design complexity. We contribute to AEC research field with an exploration towards a more effective design scheduling theory. Furthermore, design managers can use the emerging qualitative framework as a help in creating design schedules. Finally, we call for additional temporal research in the area of construction project management and, more specifically, in construction design management.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo, Temeljne tehničke znanosti



POVEZANOST RADA


Projekti:
082-0000000-2991 - Razvoj informatičke tehnologije u hrvatskom graditeljstvu (Izetbegović, Jadranko, MZOS ) ( CroRIS)

Ustanove:
Građevinski fakultet, Zagreb

Profili:

Avatar Url Vedran Žerjav (autor)


Citiraj ovu publikaciju:

Zerjav, Vedran; Hartmann, Timo
Integrating Engineering Design through Temporal Coordination // EPOC 2011 - Working Paper Series: Proceedings of the Engineering Project Organization Conference / Paul Chinowsky, Ray Levitt (ur.).
Jezero Tahoe (CA), Sjedinjene Američke Države: Engineering Project Organization Society, 2010. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Zerjav, V. & Hartmann, T. (2010) Integrating Engineering Design through Temporal Coordination. U: Paul Chinowsky, R. (ur.)EPOC 2011 - Working Paper Series: Proceedings of the Engineering Project Organization Conference.
@article{article, author = {Zerjav, Vedran and Hartmann, Timo}, editor = {Paul Chinowsky, R.}, year = {2010}, keywords = {Construction design integration, temporal aspects in organizations, concurrent engineering, single case study.}, title = {Integrating Engineering Design through Temporal Coordination}, keyword = {Construction design integration, temporal aspects in organizations, concurrent engineering, single case study.}, publisher = {Engineering Project Organization Society}, publisherplace = {Jezero Tahoe (CA), Sjedinjene Ameri\v{c}ke Dr\v{z}ave} }
@article{article, author = {Zerjav, Vedran and Hartmann, Timo}, editor = {Paul Chinowsky, R.}, year = {2010}, keywords = {Construction design integration, temporal aspects in organizations, concurrent engineering, single case study.}, title = {Integrating Engineering Design through Temporal Coordination}, keyword = {Construction design integration, temporal aspects in organizations, concurrent engineering, single case study.}, publisher = {Engineering Project Organization Society}, publisherplace = {Jezero Tahoe (CA), Sjedinjene Ameri\v{c}ke Dr\v{z}ave} }




Contrast
Increase Font
Decrease Font
Dyslexic Font