Pregled bibliografske jedinice broj: 520762
Construction time-cost model in Croatia
Construction time-cost model in Croatia // International journal for engineering modelling, 22 (2009), 1-4; 63-70 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 520762 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Construction time-cost model in Croatia
Autori
Car-Pušić, Diana ; Radujković, Mladen
Izvornik
International journal for engineering modelling (1330-1365) 22
(2009), 1-4;
63-70
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
construction time ; „time-cost“ model ; constants K and B ; linear regression analysis ; building projects
Sažetak
The paper deals with the applicability of the «time-cost» model for calculating the sustainable construction time for building projects in Croatia. In this model the time is expressed as a function of money in the project, while the specific constants K and B need to be determined. These constants depend on economic characteristics of the country or a larger area and therefore had to be separately calculated for a region with similar economic characteristics. The modeling of the constants was performed for two groups of building projects – the roads and residential and office multi-storey buildings. The obtained results have been analyzed and compared to the corresponding results from abroad.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Projekti:
MZOS-082-0822156-2993 - Upravljanje rizikom i promjenama u projektno usmjerenom građevinskom poslovanju (Radujković, Mladen, MZOS ) ( CroRIS)
Ustanove:
Građevinski fakultet, Zagreb,
Građevinski fakultet, Rijeka
Citiraj ovu publikaciju:
Časopis indeksira:
- Scopus