Pregled bibliografske jedinice broj: 514814
Ground Improvement in Large Infrastructure Projects – Croatian Experience
Ground Improvement in Large Infrastructure Projects – Croatian Experience // Advancing and Integrating Construction Education, Research & Practice / Syed, Ahmed (ur.).
Karachi: NED University of Engineering and Technology, 2010. str. 615-622 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 514814 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Ground Improvement in Large Infrastructure Projects – Croatian Experience
Autori
Kovačević, Meho Saša ; Cerić, Anita
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Advancing and Integrating Construction Education, Research & Practice
/ Syed, Ahmed - Karachi : NED University of Engineering and Technology, 2010, 615-622
ISBN
1-884342-02-4
Skup
Second International Conference on Construction In Developing Countries (ICCIDC–II)
Mjesto i datum
Kairo, Egipat, 03.08.2010. - 05.08.2010
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Ground improvement; infrastructure; foundation; risk; quality control
Sažetak
In modern construction, the need for foundation of heavy structures and building infrastructure on weak soils, those with inadequate bearing capacity, has become increasingly common. The decision as to which foundation methodology is suitable for such situations depends on the systematic examination of a range of influencing factors ; the adequacy and quality of information, the number of alternatives available to choose from, as well as the use of appropriate models and techniques towards the selection of the optimal, most favourable, alternative. In the selection of a suitable ground improvement technology a number of factors must be taken into account, of which the following are most significant: ground improvement goal, namely the degree of increase in stiffness, load bearing capacity or permeability, suface, depth and total volume of the soil being improved, soil type and its mechanical characteristics, availability of materials for the improvement (sand, gravel, mix), ecological factors and local experience, turnaround time and, of course, expenses. The paper presents the Croatian experience in decision making, risk control, designing, executing and quality control of ground improvement.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Projekti:
082-0822161-2187 - Ispitivanje i modeliranje poboljšanog tla i stijene (Kovačević, Meho-Saša, MZOS ) ( CroRIS)
082-0822156-2998 - Upravljanje ljudskim potencijalima u građevinarstvu (Cerić, Anita, MZOS ) ( CroRIS)
Ustanove:
Građevinski fakultet, Zagreb