Krško NPP PSA Update with SG BD System Modifications // Proceedings and Book of Abstracts of 8th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids / Pevec, Dubravko ; Subašić, Damir ; Šimić, Zdenko (ur.).
Zagreb: Hrvatsko nuklearno društvo, 2010. str. S6-58-1-S6-58-13 (poster, međunarodna recenzija, cjeloviti rad (in extenso), stručni)
CROSBI ID: 473743 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Krško NPP PSA Update with SG BD System Modifications
Autori
Vrbanić, Ivan ; Bašić, Ivica ; Vuković, Igor
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), stručni
Izvornik
Proceedings and Book of Abstracts of 8th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
/ Pevec, Dubravko ; Subašić, Damir ; Šimić, Zdenko - Zagreb : Hrvatsko nuklearno društvo, 2010, S6-58-1-S6-58-13
ISBN
978-953-55224-3-0
Skup
8th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
Mjesto i datum
Dubrovnik, Hrvatska, 16.05.2010. - 20.05.2010
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Krško NPP; safety; PSA; steam generator; blowdown
Sažetak
Evaluations done for the purposes of definition of environmental qualification zones at Krško NPP have shown that, due to potential pipe rupture event in the Steam Generator Blowdown Processing (BD) System, a significant area in the Intermediate Building could become a “harsh” zone. As a consequence, a number of important components, including the Safety Class DC Batteries, Battery Chargers and Motor Driven Auxiliary Feedwater Pumps could be lost following the break in the SG BD line. The same hazard would also affect the Remote Shutdown Panels (Evacuation Panels), located in the affected area, which could result in interactions that would possibly affect safety mitigation systems. The SG BD high energy line break (HELB) would, therefore, represent an initiator with possible significant degradation in plant mitigation capability. Recognizing this, Krško NPP decided to implement a design modification and install the equipment that would detect the SG BD line break and isolate the ruptured pipe in a short time. During plant modification to BD Isolation System the shielding in the form of steel plates for the Cable Trays in the plant room / area IB021 was installed. This was necessary in order to protect the control and power cables for the Remote Shutdown Panels from the dynamic effects produced by a HELB event, such as steam jet impingement, should the postulated break occur in the IB021 area. The results of updated referential Krško NPP PSA model with the above mentioned plant design modifications are presented in this paper. Also the residual risk from the SG BD HELB events, i.e., the risk after the plant modifications are implemented, was assessed. Both Level 1 and Level 2 PSA models were updated in detail. This included the characterization of hazard in the form of hazard damage states, plant response analysis to determine the impact of hazard on the plant equipment in the affected rooms, considering also the containment systems, and Level 1 and Level 2 PSA modelling. The residual risk from the SG BD HELB events was assessed in terms of PSA Level 1 and Level 2.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika
POVEZANOST RADA
Projekti:
036-0361590-1589 - Nuklearne elektrane za održivu proizvodnju električne energije (Feretić, Danilo, MZO ) ( CroRIS)
Ustanove:
Fakultet elektrotehnike i računarstva, Zagreb