Pregled bibliografske jedinice broj: 473578
Using Multicriteria Optimization in Process Planning
Using Multicriteria Optimization in Process Planning // 3rd International Conference for Entrepreneurship, Innovation and Regional Development (ICEIRD2010) : proceedings / Zoran, Anišić (ur.).
Novi Sad: Faculty of technical sciences, Department for Industrial Engineering and Management, UNESCO Chair in Entrepreneurial Studies & CISCO Entrepreneur Institute, Training Centre Serbia,, 2010. str. 140-147 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 473578 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Using Multicriteria Optimization in Process Planning
Autori
Ćosić, Predrag ; Lisjak, Dragutin ; Antolić, Dražen
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
3rd International Conference for Entrepreneurship, Innovation and Regional Development (ICEIRD2010) : proceedings
/ Zoran, Anišić - Novi Sad : Faculty of technical sciences, Department for Industrial Engineering and Management, UNESCO Chair in Entrepreneurial Studies & CISCO Entrepreneur Institute, Training Centre Serbia,, 2010, 140-147
ISBN
978-86-7892-250-3
Skup
International Conference for Entrepreneurship, Innovation and Regional Development (3 ; 2010)
Mjesto i datum
Novi Sad, Srbija, 27.05.2010. - 29.05.2010
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
multicriteria optimization; STEP method; process planning
Sažetak
Estimation of production time, delivery term, production costs etc., are some of the key problems of unit production. In the previous research strong correlation was discovered between the features of the product drawing and production time, which has resulted with 8 regression equations. They were realized using stepwise multiple linear regression. Since the optimization of these regression equations did not fully define the most frequent requirements, multicriteria optimization was applied. The applied criteria included: minimum production time, maximum work costs/total costs ratio for a group of workpieces. The group was created using specific classifiers that defined similar workpieces. A STEP model with seven decision variables within a group was applied, and the groups with a high index of determination were selected. Independent values that maximize the work costs/total costs ratio and minimize production times were determined. The obtained regression equations of time production parts and work costs/total costs ratio are included in the objective functions to reduce production time and increasing, work costs/total costs at the same time. The values of decision variables that minimize production time and maximize work costs/total costs ratio were determined. As the solution of the described problem, multicriteria interactive STEP method was applied.
Izvorni jezik
Engleski
Znanstvena područja
Strojarstvo
POVEZANOST RADA
Projekti:
120-1521781-3116 - UTJECAJ PROCESA PROIZVODNJE NA KOMPETITIVNOST I ODRŽIVOST RAZVOJA (Ćosić, Predrag, MZOS ) ( CroRIS)
Ustanove:
Fakultet strojarstva i brodogradnje, Zagreb