Implementation of Fault Slip Through in Design Phase of the Project
Implementation of Fault Slip Through in Design Phase of the Project // Proceedings MIPRO 2008, 31st International Convention on Information and Communication Technology, Electronics and Microelectronics, Vol. II CTI Telecommunications & Information / Stjepan Golubić, Branko Mikac, Vlasta Hudek (ur.).
Zagreb: Denona, 2008. str. 134-138 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 426056 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Implementation of Fault Slip Through in Design Phase of the Project
Autori
Hribar, Lovre ; Bogovac, Sanja ; Marinčić, Zdenko
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings MIPRO 2008, 31st International Convention on Information and Communication Technology, Electronics and Microelectronics, Vol. II CTI Telecommunications & Information
/ Stjepan Golubić, Branko Mikac, Vlasta Hudek - Zagreb : Denona, 2008, 134-138
ISBN
978-953-233-043-4
Skup
MIPRO 2008
Mjesto i datum
Opatija, Hrvatska, 26.05.2008. - 30.05.2008
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Next generation Network; FST; Quality of Service; efficiency; TTM
Sažetak
The Fault Slip Through (FST) process is a way to secure early, correct and cost effective fault detection through analysis of issued trouble reports. A way to secure that faults are found in the right phase ; Right phase means the most cost-efficient phase. It is a (fault based) method for identifying improvement opportunities. A method of measuring how many percent of faults inserted in one phase of development are detected and corrected in a later phase of testing and/or operation. The process brings many advantages such as early correct and cost effective fault detection, enables fault slippage measurements, avoiding doing the same mistakes over and over again, less redundant testing and closer test coordination, improved quality and less stopping faults, shorter lead times and improved delivery precision and finally less resource con-sumption in the latest phases of the projects (cost efficiency). This paper gives an interesting industrial example for the ap-plication of the FST method.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika, Računarstvo, Informacijske i komunikacijske znanosti
POVEZANOST RADA
Ustanove:
Fakultet elektrotehnike, strojarstva i brodogradnje, Split,
Fakultet elektrotehnike i računarstva, Zagreb,
Ericsson Nikola Tesla d.d.