Implementation of the 5S Method in the Production System
Implementation of the 5S Method in the Production System // Proceedings of 12th International Scientific Conference on Production Engineering / Abele, Eberhard ; Udiljak, Toma ; Ciglar, Damir (ur.).
Zagreb: Hrvatska udruga proizvodnog strojarstva (HUPS), 2009. str. 245-250 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 420286 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Implementation of the 5S Method in the Production System
Autori
Veža, Ivica ; Bilić, Boženko ; Balič, Joža ; Mladineo, Marko
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of 12th International Scientific Conference on Production Engineering
/ Abele, Eberhard ; Udiljak, Toma ; Ciglar, Damir - Zagreb : Hrvatska udruga proizvodnog strojarstva (HUPS), 2009, 245-250
ISBN
978-953-7689-00-1
Skup
CIM 2009
Mjesto i datum
Biograd na Moru, Hrvatska, 17.06.2009. - 20.06.2009
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Toyota Production System; 5S; shipyard
Sažetak
The 5S method is a sophisticated Japanese tool for optimisation and improvement of the production process. The purpose of applying the 5S method is to increase the efficiency on the micro-level, keeping workplace clean, in order and accessible. The results are reflected in drastic increase of safety, space utilization, productivity, pride and Kaizen thinking ; and drastic reduction of waste, defects, errors, and unnecessary action. This method is one of the foundations of introducing the concept of Lean Production. This article provides an example of applying the 5S method in a shipyard.
Izvorni jezik
Engleski
Znanstvena područja
Strojarstvo, Temeljne tehničke znanosti
POVEZANOST RADA
Projekti:
023-0231926-2194 - Tehnološko-organizacijsko optimiranje kompetencijske stanice
Ustanove:
Fakultet elektrotehnike, strojarstva i brodogradnje, Split