Pregled bibliografske jedinice broj: 41725
Nonlinear simulation model of the HPP with double regulated turbine
Nonlinear simulation model of the HPP with double regulated turbine // Digital Power Systems Simulators, Session VI Modeling II / Kezunovic, Mladen (ur.).
Västerås: ABB, Elforsk, 1999. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 41725 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Nonlinear simulation model of the HPP with double regulated turbine
Autori
Kuzle, Igor ; Tešnjak, Sejid ; Brezovec, Miljenko
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Digital Power Systems Simulators, Session VI Modeling II
/ Kezunovic, Mladen - Västerås : ABB, Elforsk, 1999
Skup
Third International Conference on Digital Power System Simulators 99 (ICDS99)
Mjesto i datum
Västerås, Švedska, 25.05.1999. - 28.05.1999
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
hydro unit; double regulated turbine; guide vanes; adjustable runner blades; cam; hill diagram; linear approximation by parts; non-linear model; function of two variables; efficiency
Sažetak
The paper presents a mathematical model of a hydroelectric unit with double regulated turbine which uses linear approximation by parts method for description of non-linear turbine characteristics. Detailed model of double regulated turbine for large perturbation analysis is explained. Hydro unit efficiency is also included in the model. Auxiliary mathematical tools for measured data processing are also described. The simulation results are compared with measurements made on-site at the HPP Dubrava.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika