RJEČINA BRIDGE ON THE RIJEKA CITY ROUNDABOUT


Šavor, Zlatko; Gukov, Igor; Bleiziffer, Jelena; Hrelja, Gordana; Kalafatić, Ivan; Franetović, Marin
RJEČINA BRIDGE ON THE RIJEKA CITY ROUNDABOUT // Proceedings of the 4th CCC Scientific Symposium - CONCRETE ENGINEERING IN URBAN DEVELOPMENT / Radić, Jure ; Bleiziffer, Jelena (ur.).
Zagreb: SECON HDGK, 2008. str. 311-318 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 387223 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
RJEČINA BRIDGE ON THE RIJEKA CITY ROUNDABOUT

Autori
Šavor, Zlatko ; Gukov, Igor ; Bleiziffer, Jelena ; Hrelja, Gordana ; Kalafatić, Ivan ; Franetović, Marin

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
Proceedings of the 4th CCC Scientific Symposium - CONCRETE ENGINEERING IN URBAN DEVELOPMENT / Radić, Jure ; Bleiziffer, Jelena - Zagreb : SECON HDGK, 2008, 311-318

ISBN
978-953-7621-01-8

Skup
4th Central European Congresses on Concrete Engineering - Concrete Engineering in Urban Development

Mjesto i datum
Opatija, Hrvatska, 02.10.2008. - 03.10.2008

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Strut frame bridge; twin bridges; bridge design; bridge construction

Sažetak
A new bridge is currently built parallel to and south of the Rječina Bridge of the Rijeka city roundabout. The new Rječina Bridge is a prestressed concrete rigid strut frame structure with the box type superstructure. The superstructure is continuous over three spans, with the main span of 108.5 m and with two identical side spans of 50.0 m each. Its new design exemplifies more stringent requirements on bridge structures, incorporated in current structural standards in comparison to standards valid about thirty years ago. The bridge construction started in spring 2008 by two different construction companies, each building half of the bridge and utilizing their own technology. Side spans are constructed on scaffolding and the main centre span by free cantilevering method. The Zvir water spring, supplying the Rijeka city with fresh water, is located underneath the bridge limiting the choice of possible construction methods. A special anchor block connected by prestressing tendons to the anchor wall had to be built to facilitate the free cantilever construction of the main centre span, instead of standard rock anchors, because their grouting was forbidden in order not to endanger the quality of water from the spring.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
082-0822977-1497 - Granična stanja i održivost mostova

Ustanove:
Građevinski fakultet, Zagreb


Citiraj ovu publikaciju:

Šavor, Zlatko; Gukov, Igor; Bleiziffer, Jelena; Hrelja, Gordana; Kalafatić, Ivan; Franetović, Marin
RJEČINA BRIDGE ON THE RIJEKA CITY ROUNDABOUT // Proceedings of the 4th CCC Scientific Symposium - CONCRETE ENGINEERING IN URBAN DEVELOPMENT / Radić, Jure ; Bleiziffer, Jelena (ur.).
Zagreb: SECON HDGK, 2008. str. 311-318 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Šavor, Z., Gukov, I., Bleiziffer, J., Hrelja, G., Kalafatić, I. & Franetović, M. (2008) RJEČINA BRIDGE ON THE RIJEKA CITY ROUNDABOUT. U: Radić, J. & Bleiziffer, J. (ur.)Proceedings of the 4th CCC Scientific Symposium - CONCRETE ENGINEERING IN URBAN DEVELOPMENT.
@article{article, author = {\v{S}avor, Zlatko and Gukov, Igor and Bleiziffer, Jelena and Hrelja, Gordana and Kalafati\'{c}, Ivan and Franetovi\'{c}, Marin}, year = {2008}, pages = {311-318}, keywords = {Strut frame bridge, twin bridges, bridge design, bridge construction}, isbn = {978-953-7621-01-8}, title = {RJE\v{C}INA BRIDGE ON THE RIJEKA CITY ROUNDABOUT}, keyword = {Strut frame bridge, twin bridges, bridge design, bridge construction}, publisher = {SECON HDGK}, publisherplace = {Opatija, Hrvatska} }
@article{article, author = {\v{S}avor, Zlatko and Gukov, Igor and Bleiziffer, Jelena and Hrelja, Gordana and Kalafati\'{c}, Ivan and Franetovi\'{c}, Marin}, year = {2008}, pages = {311-318}, keywords = {Strut frame bridge, twin bridges, bridge design, bridge construction}, isbn = {978-953-7621-01-8}, title = {RJE\v{C}INA BRIDGE ON THE RIJEKA CITY ROUNDABOUT}, keyword = {Strut frame bridge, twin bridges, bridge design, bridge construction}, publisher = {SECON HDGK}, publisherplace = {Opatija, Hrvatska} }




Contrast
Increase Font
Decrease Font
Dyslexic Font