Site establishment dynamics during construction of Eurodom in Osijek
Site establishment dynamics during construction of Eurodom in Osijek // Organization, technology and management in construction / Radujković, Mladen ; Mlinarić, Vjeran ; Izetbegović, Jadranko ; Cerić, Anita (ur.).
Umag: Hrvatska Udruga za Organizaciju Građenja, 2008. str. 16-16 (predavanje, međunarodna recenzija, sažetak, stručni)
CROSBI ID: 371474 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Site establishment dynamics during construction of Eurodom in Osijek
Autori
Dolaček-Alduk, Zlata ; Čorić, Josip ; Dadić, Tamara ; Brleković, Dražen
Vrsta, podvrsta i kategorija rada
Sažeci sa skupova, sažetak, stručni
Izvornik
Organization, technology and management in construction
/ Radujković, Mladen ; Mlinarić, Vjeran ; Izetbegović, Jadranko ; Cerić, Anita - Umag : Hrvatska Udruga za Organizaciju Građenja, 2008, 16-16
ISBN
953-96245-8-4
Skup
8th International Conference (5th SENET Conference) Organization, technology and management in construction
Mjesto i datum
Umag, Hrvatska, 17.09.2008. - 20.09.2008
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
site establishment; preliminary works; construction site organization; construction management
Sažetak
The construction site of the Eurodom causes great attention of construction profession because of the fact that it is the biggest construction site in the city and its surroundings. The construction of Eurodom reached some of the significant construction achievements like the deepest sheet-pile wall with free end, the biggest ground anchors in sandy-clayey soil, one of the deepest excavation pits in Croatia, as well as the construction of drainage system with the aim of preventing water buoyancy on the foundation slab with its own pumping station. Because of the fact that the construction site is situated in an urban city environment with very high traffic intensity, there was a need of extensive and detailed preliminary works on construction site organization, along with ensuring access to the site and conducting demanding construction works under the condition that contact public and traffic areas stay untouched. This paper presents the dynamics of these works in terms of changes in site establishment that were happening in line with the type and proportion of works on the site from the preliminary works, during excavations, till today, when the construction project of the future complex is in progress.