Pregled bibliografske jedinice broj: 335509
Preliminary design procedure for one span post-tensioned stress-ribbon bridge
Preliminary design procedure for one span post-tensioned stress-ribbon bridge // DAAAM International Scientific Book 2006 / Katalinic, Branko (ur.).
Beč: DAAAM International Vienna, 2006. str. 313-328
CROSBI ID: 335509 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Preliminary design procedure for one span post-tensioned stress-ribbon bridge
Autori
Kalafatić, Ivan ; Radić, Jure ; Medak , Matko
Vrsta, podvrsta i kategorija rada
Poglavlja u knjigama, znanstveni
Knjiga
DAAAM International Scientific Book 2006
Urednik/ci
Katalinic, Branko
Izdavač
DAAAM International Vienna
Grad
Beč
Godina
2006
Raspon stranica
313-328
ISBN
3-901509-47-X
Ključne riječi
Stress-ribbon bridge, preliminary design procedure, one span, posttensioning
Sažetak
Stress-ribbon bridges are very slender structures used mainly for pedestrian and cycling traffic. Nowadays most deck slabs on stress-ribbon bridges are made of precast concrete segments eliminating usage of scaffolding and reducing cost of human labour. Main building components of bridge deck are bearing cables, concrete plate segments and cables for additional prestressing. Simplified design procedure for one span stress-ribbon bridge defined in Japanese Standards for Design of Stress-Ribbon Bridges is based on theory developed by prof. Eibl (Eibl et al., 1973.) He neglected different heights of bridge abutments and real length of bridge deck. This paper describes preliminary static design procedure for one span post-tensioned stress-ribbon bridge taking into account real length of structure and different heights of abutments. Main goal of defined procedure is to achieve desired shape of bridge deck under dead load and to optimize the number of bearing and post-tensioning cables.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Ustanove:
Građevinski fakultet, Zagreb