Pregled bibliografske jedinice broj: 332237
Methodology for Determing Cost of Mechanical Work During Construction
Methodology for Determing Cost of Mechanical Work During Construction // 7th International Conference “ Organisation, Technology and Management in Construction” ; Proceedings on CD-ROM (on 8 pages) / Mladen Radujković… [et al.] (ur.).
Zagreb: SENET, CAPM, Građevinski fakultet Sveučilišta u Zagrebu, 2006. (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 332237 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Methodology for Determing Cost of Mechanical Work During Construction
Autori
Bezak, Stjepan ; Linarić, Zdravko
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
7th International Conference “ Organisation, Technology and Management in Construction” ; Proceedings on CD-ROM (on 8 pages)
/ Mladen Radujković… [et al.] - Zagreb : SENET, CAPM, Građevinski fakultet Sveučilišta u Zagrebu, 2006
ISBN
953-96245-6-8
Skup
7th International Conference “ Organisation, Technology and Management in Construction”
Mjesto i datum
Zadar, Hrvatska, 20.09.2006. - 22.09.2006
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Construction; water engineering; earthwork; cost of work; hourly price of machine
Sažetak
A methodological approach to deteremining the price of working hour of earthmoving machinery is described in the paper. The methodology has been applied in the construction of water engineering. The results obtained through application of this methodology are presented, statistically processed, and compared with results of other existing methodologies presented in literature.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo