Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 294622

An Optimal Clock Period Selection Method Based on Slack Minimization Criteria


Chang, E. S.; Gajski, Danijel
An Optimal Clock Period Selection Method Based on Slack Minimization Criteria // ACM Transactions on Design Automation of Electronic Systems, 1 (1996), 3; 352-370 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 294622 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
An Optimal Clock Period Selection Method Based on Slack Minimization Criteria

Autori
Chang, E. S. ; Gajski, Danijel

Izvornik
ACM Transactions on Design Automation of Electronic Systems (1084-4309) 1 (1996), 3; 352-370

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
clock period; clock slack; performance estimation; scheduling

Sažetak
An important decision in synthesizing a hardware implementation from a behavioral description is selecting the clock period to schedule the datapath operations into control steps. Prior to scheduling, most existing behavioral synthesis systems either require the designer to specify the clock period explicitly or require that the delays of the operators used in the design be specified in multiples of the clock period. An unfavorable choice of clock period could result in operations being idle for a large portion of the clock period and, consequently, affect the performance of the synthesized design. In this article, we demonstrate the effect of clock slack on the performance of designs and present an algorithm to find a slack-minimal clock period. We prove the optimality of our method and apply it to several examples to demonstrate its effectiveness in maximizing design performance.

Izvorni jezik
Engleski

Znanstvena područja
Računarstvo



POVEZANOST RADA


Ustanove:
Fakultet elektrotehnike i računarstva, Zagreb

Profili:

Avatar Url Daniel Gajski (autor)


Citiraj ovu publikaciju:

Chang, E. S.; Gajski, Danijel
An Optimal Clock Period Selection Method Based on Slack Minimization Criteria // ACM Transactions on Design Automation of Electronic Systems, 1 (1996), 3; 352-370 (međunarodna recenzija, članak, znanstveni)
Chang, E. & Gajski, D. (1996) An Optimal Clock Period Selection Method Based on Slack Minimization Criteria. ACM Transactions on Design Automation of Electronic Systems, 1 (3), 352-370.
@article{article, author = {Chang, E. S. and Gajski, Danijel}, year = {1996}, pages = {352-370}, keywords = {clock period, clock slack, performance estimation, scheduling}, journal = {ACM Transactions on Design Automation of Electronic Systems}, volume = {1}, number = {3}, issn = {1084-4309}, title = {An Optimal Clock Period Selection Method Based on Slack Minimization Criteria}, keyword = {clock period, clock slack, performance estimation, scheduling} }
@article{article, author = {Chang, E. S. and Gajski, Danijel}, year = {1996}, pages = {352-370}, keywords = {clock period, clock slack, performance estimation, scheduling}, journal = {ACM Transactions on Design Automation of Electronic Systems}, volume = {1}, number = {3}, issn = {1084-4309}, title = {An Optimal Clock Period Selection Method Based on Slack Minimization Criteria}, keyword = {clock period, clock slack, performance estimation, scheduling} }

Časopis indeksira:


  • Web of Science Core Collection (WoSCC)
    • SCI-EXP, SSCI i/ili A&HCI
  • Scopus





Contrast
Increase Font
Decrease Font
Dyslexic Font