Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 287902

Preparation of Railway Infrastructure for the Operation of Tilting Trains


Stipetić, Antun; Kreč, Miro
Preparation of Railway Infrastructure for the Operation of Tilting Trains // Promet - Traffic & Transportation, 18 (2006), 1; 7-15 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 287902 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Preparation of Railway Infrastructure for the Operation of Tilting Trains

Autori
Stipetić, Antun ; Kreč, Miro

Izvornik
Promet - Traffic & Transportation (0353-5320) 18 (2006), 1; 7-15

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
Railway modernisation; tilting tehnology; infrastructure; design parameters; lines with curves; Zagreb-Split railway line

Sažetak
The tilting tehnology appeared as an idea more than 50 years ago. The idea started to be applied in the design of transport means in a more significant manner during the 80s of the last century, and has experienced mayor development during the last decade. The trains featuring tilting tehnology occupy their place on the market segment as the posibility of improving the conditions (speeds commercialy 10-20%) on winding lines with curve radius not less than 250 m. They do not represent an alternative to the developement of railway lines on traffic routes, but rather a span between the present and the future. The work studies the basic technical elements of the tilting tehnology with the emphasis on the area of infrastructure and what is recommended and should be done on the infrastrucure so that the tilting tehnology could render the optimal results. It is concluded that the use of tilting tehnology does not seek any special technical solutions , but the certain elements of the rail design require attention and should be designed in appropriate way, at the same time not making it more expensive , but still improving the results of implementing the tilting tehnology in trains.

Izvorni jezik
Engleski

Znanstvena područja
Tehnologija prometa i transport



POVEZANOST RADA


Ustanove:
Fakultet prometnih znanosti, Zagreb

Profili:

Avatar Url Antun Stipetić (autor)


Citiraj ovu publikaciju:

Stipetić, Antun; Kreč, Miro
Preparation of Railway Infrastructure for the Operation of Tilting Trains // Promet - Traffic & Transportation, 18 (2006), 1; 7-15 (međunarodna recenzija, članak, znanstveni)
Stipetić, A. & Kreč, M. (2006) Preparation of Railway Infrastructure for the Operation of Tilting Trains. Promet - Traffic & Transportation, 18 (1), 7-15.
@article{article, author = {Stipeti\'{c}, Antun and Kre\v{c}, Miro}, year = {2006}, pages = {7-15}, keywords = {Railway modernisation, tilting tehnology, infrastructure, design parameters, lines with curves, Zagreb-Split railway line}, journal = {Promet - Traffic and Transportation}, volume = {18}, number = {1}, issn = {0353-5320}, title = {Preparation of Railway Infrastructure for the Operation of Tilting Trains}, keyword = {Railway modernisation, tilting tehnology, infrastructure, design parameters, lines with curves, Zagreb-Split railway line} }
@article{article, author = {Stipeti\'{c}, Antun and Kre\v{c}, Miro}, year = {2006}, pages = {7-15}, keywords = {Railway modernisation, tilting tehnology, infrastructure, design parameters, lines with curves, Zagreb-Split railway line}, journal = {Promet - Traffic and Transportation}, volume = {18}, number = {1}, issn = {0353-5320}, title = {Preparation of Railway Infrastructure for the Operation of Tilting Trains}, keyword = {Railway modernisation, tilting tehnology, infrastructure, design parameters, lines with curves, Zagreb-Split railway line} }

Časopis indeksira:


  • Scopus





Contrast
Increase Font
Decrease Font
Dyslexic Font