Risk estimation in the process of construction project calculation


Radujković, M.; Bevanda, L.
Risk estimation in the process of construction project calculation // Book of abstracts and congress programme ; 5th world congress on cost engineering, Project management & quantity surveying
Ljubljana, 2006. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 283635 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Risk estimation in the process of construction project calculation

Autori
Radujković, M. ; Bevanda, L.

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
Book of abstracts and congress programme ; 5th world congress on cost engineering, Project management & quantity surveying / - Ljubljana, 2006

Skup
5th world congress on cost engineering, Project management & quantity surveying, ICEC

Mjesto i datum
Ljubljana, Slovenija, 23.04.2006. - 26.04.2006

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Business systems; Mesurable goals; Balanced scorecard; Project scorecard

Sažetak
The paper deals with one of the possible methods of “ procedural” construction calculation and with the risk assessment in cost calculation of construction works projects. Project cost is being divided “ procedurally” according to their sensitivities to risk impact. Samples and cost groups from the division of their own relative components in the total project cost. We pre-suppose the possibility of determining the probability division of an individual risk impact on the alteration of an individual component of a project cost. Each cost component is matched by a division of relative deviations caused by an individual risk. The sensitivities of a cost component and of a total cost of construction project to an individual and all risk is analyzed by simulation of individual components in total project cost and I their corresponding to individual risk impacts. We get a population of accidental project cost with risk impact by a simulation. A cumulative frequency of total construction project cost with the calculated risk impact is going to enable the estimation of the final project cost, i.e. the cost component needed for a risk covering.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
0082208

Ustanove:
Građevinski fakultet, Zagreb

Profili:

Avatar Url Ladislav Bevanda (autor)

Avatar Url Mladen Radujković (autor)


Citiraj ovu publikaciju:

Radujković, M.; Bevanda, L.
Risk estimation in the process of construction project calculation // Book of abstracts and congress programme ; 5th world congress on cost engineering, Project management & quantity surveying
Ljubljana, 2006. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Radujković, M. & Bevanda, L. (2006) Risk estimation in the process of construction project calculation. U: Book of abstracts and congress programme ; 5th world congress on cost engineering, Project management & quantity surveying.
@article{article, author = {Radujkovi\'{c}, M. and Bevanda, L.}, year = {2006}, pages = {ORM-09 1-9}, keywords = {Business systems, Mesurable goals, Balanced scorecard, Project scorecard}, title = {Risk estimation in the process of construction project calculation}, keyword = {Business systems, Mesurable goals, Balanced scorecard, Project scorecard}, publisherplace = {Ljubljana, Slovenija} }
@article{article, author = {Radujkovi\'{c}, M. and Bevanda, L.}, year = {2006}, pages = {ORM-09 1-9}, keywords = {Business systems, Mesurable goals, Balanced scorecard, Project scorecard}, title = {Risk estimation in the process of construction project calculation}, keyword = {Business systems, Mesurable goals, Balanced scorecard, Project scorecard}, publisherplace = {Ljubljana, Slovenija} }




Contrast
Increase Font
Decrease Font
Dyslexic Font