Pregled bibliografske jedinice broj: 259975
Design and construction of Jasenovac bridge
Design and construction of Jasenovac bridge // Bridges / Radić, Jure (ur.).
Zagreb: SECON HDGK, 2006. str. 97-106 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), ostalo)
CROSBI ID: 259975 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Design and construction of Jasenovac bridge
Autori
Šavor, Zlatko ; Mujkanović, Nijaz ; Hrelja, Gordana
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), ostalo
Izvornik
Bridges
/ Radić, Jure - Zagreb : SECON HDGK, 2006, 97-106
Skup
International conference on bridges
Mjesto i datum
Dubrovnik, Hrvatska, 21.05.2006. - 24.05.2006
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Prestressed concrete bridge; Destroyed bridge; Steel orthotropic plate
Sažetak
The bridge crossing across the Sava and Una Rivers at Jasenovac, comprising seven independent bridge structures, provides the road link between Croatia and Bosnia and Herzegovina. During the Croatian war for independence several parts of the bridge were destroyed or damaged, including the main prestressed concrete bridge across the Sava River. The destroyed bridge and the reconstructed steel orthotropic plate superstructure are described. The design of the reconstruction of the main bridge across the Sava River at Jasenovac was constrained by the fact that it had to be fitted between two existing bridge sections, the approach bridge on the left bank and the intersection on the right bank with predefined road alignment and deck widths. The chosen color for the superstructure is dark grey to accentuate steel, but not aggressively, to blend harmonically with other concrete bridge sections. The reconstruction took place under difficult circumstances, mined surroundings, removal of the destroyed prestressed concrete bridge, damages to piers, damaged foundations, localized damage and worn-out structural parts and furnishings. With combined effort of all involved parties the bridge was successfully reconstructed in seventeen months from January 2004 to May 2005.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo