Bridge over river Zrmanja in Obrovac


Ukrainczyk, Boris; Radić, Jure
Bridge over river Zrmanja in Obrovac // Bridges / Radić, Jure (ur.).
Zagreb: SECON HDGK, 2006. str. 915-922 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), ostalo)


CROSBI ID: 255728 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Bridge over river Zrmanja in Obrovac

Autori
Ukrainczyk, Boris ; Radić, Jure

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), ostalo

Izvornik
Bridges / Radić, Jure - Zagreb : SECON HDGK, 2006, 915-922

Skup
International conference on bridges

Mjesto i datum
Dubrovnik, Hrvatska, 21.05.2006. - 24.05.2006

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
bridge inspection; bridge rehabilitation; concrete pavement

Sažetak
The bridge in Obrovac was built from 1950-1952, on the foundations of the previous bridge demolitioned at the end of the World War II. The span construction consists of four continuous classically reinforced girders with the upper reinforced concrete deck. The central span is 42.2 m and both overhang spans are 13.6 m. After 50 years of service, a bridge inspection was made. Stone lining of the piers and abutments in the water level change-zone of river was significantly damaged. At dilatation points were cracks in the asphalt and 5 cm delevelling on the pedestrian lanes. Based on the visual inspection of the bridge concrete structure and sample laboratory tests it has been concluded that the quality of concrete is very good. Damages due to rebar corrosion were limited to the outside surface of the external girders and pedestrian lanes. Based on the bridge inspection results, a design for bridge rehabilitation was developed, and the rehabilitation works were done. The outside girder concrete was reconstructed in the way that the rebar protective layer was replaced with polymer modified special concrete. The old cornice was replaced with the new one where additional rebar was installed. Underview of the pedestrian lanes was also reconstructed. The existing steel curb was replaced with the new one at the top curved towards the pedestrian lane. The existing asphalt pavement and hydro-isolation were replaced with a single overlay of fiber reinforced polymer modified concrete, bonded to the exsisting concrete deck, and was also the bridge’ s final surface. During the repair works the traffic was ongoing, alternatively, on a single traffic lane.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
0082219

Ustanove:
Građevinski fakultet, Zagreb

Profili:

Avatar Url Jure Radić (autor)


Citiraj ovu publikaciju:

Ukrainczyk, Boris; Radić, Jure
Bridge over river Zrmanja in Obrovac // Bridges / Radić, Jure (ur.).
Zagreb: SECON HDGK, 2006. str. 915-922 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), ostalo)
Ukrainczyk, B. & Radić, J. (2006) Bridge over river Zrmanja in Obrovac. U: Radić, J. (ur.)Bridges.
@article{article, author = {Ukrainczyk, Boris and Radi\'{c}, Jure}, editor = {Radi\'{c}, J.}, year = {2006}, pages = {915-922}, keywords = {bridge inspection, bridge rehabilitation, concrete pavement}, title = {Bridge over river Zrmanja in Obrovac}, keyword = {bridge inspection, bridge rehabilitation, concrete pavement}, publisher = {SECON HDGK}, publisherplace = {Dubrovnik, Hrvatska} }
@article{article, author = {Ukrainczyk, Boris and Radi\'{c}, Jure}, editor = {Radi\'{c}, J.}, year = {2006}, pages = {915-922}, keywords = {bridge inspection, bridge rehabilitation, concrete pavement}, title = {Bridge over river Zrmanja in Obrovac}, keyword = {bridge inspection, bridge rehabilitation, concrete pavement}, publisher = {SECON HDGK}, publisherplace = {Dubrovnik, Hrvatska} }




Contrast
Increase Font
Decrease Font
Dyslexic Font