Pregled bibliografske jedinice broj: 25011
Development of the Qualified Plant Nodalization for Safety and Operational Transient Analysis
Development of the Qualified Plant Nodalization for Safety and Operational Transient Analysis // Proceedings of the 2nd International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids / Knapp, Vladimir ; Čavlina, Nikola (ur.).
Zagreb: Hrvatsko nuklearno društvo, 1998. str. 219-226 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), stručni)
CROSBI ID: 25011 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Development of the Qualified Plant Nodalization for Safety and Operational Transient Analysis
Autori
Bajs, Tomislav ; Debrecin, Nenad ; Krajnc, Božidar
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), stručni
Izvornik
Proceedings of the 2nd International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
/ Knapp, Vladimir ; Čavlina, Nikola - Zagreb : Hrvatsko nuklearno društvo, 1998, 219-226
Skup
2nd International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
Mjesto i datum
Dubrovnik, Hrvatska, 15.06.1998. - 18.06.1998
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Sažetak
The objective of the activity described in this paper was to develop "frozen and qualified" nodalization of the NPP Krško (NEK) for the large thermohydraulic code. A procedure to developed qualified nodalization for the safety analysis, as well for the operational transients has been introduced. Nodalization development and qualification process tightly involved NPP Krško personnel, in order to develop plant nodalization suitable for the operational use, and to assure that the model will present up-to-date plant.
The experience gained in the use of the large thermohydraulic codes identified three basic conditions that should be fulfilled for the correct use of the large thermohydraulic codes:
- Used code should be frozen and qualified through international assessment program;
- Developer of the nodalization should be qualified to the use of the chosen code;
- Nodalization of the plant should be properly qualified.
.Qualified plant nodalization has been developed in three stages:
1. Build-up of the qualified plant data base;
2. Development of the plant nodalization, or so called base input deck;
3. Qualification of the nodalization.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika