Four ASTAT crane controller commissioning in Avesta steel mill
Four ASTAT crane controller commissioning in Avesta steel mill, 2000. (ekspertiza).
CROSBI ID: 248645 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Four ASTAT crane controller commissioning in Avesta steel mill
Autori
Kolonić, Fetah
Izvornik
Technical report for ABB Industrial systems AB, Harbour systems, Sweden, pages 10
Vrsta, podvrsta
Ostale vrste radova, ekspertiza
Godina
2000
Ključne riječi
crane controller; steel mill
Sažetak
Expertise and commissioning for the four crane controllers ASTAT® ; ; ; for steel mill factory AVESTA is done. Expertise is considered because of the wheel-on-the-rail mounted gantry crane drive. Very rough atmosphere in steel mill factory with steel dust caused considerable problem when fast acceleration and retardation time is requested. This was the reason why usual fast commissioning procedure couldn't' be done. Some soft programs routines are applied in other to minimize delay in start and stop phase.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika, Metalurgija, Tehnologija prometa i transport
Napomena
Final testing before commissioning of the four ASTAT controllers for steel mill factory AVESTA, Sweden, is done in ABB research laboratory in Vasteras, Sweden. Laboratory testing, expertise and commissioning in AVESTA steel mill factory made by prof.dr.sc. Fetah Kolonić and doc.dr.sc. Alojz Slutej