Pregled bibliografske jedinice broj: 244879
Optimisation of Coiled Tubing Drilling Process
Optimisation of Coiled Tubing Drilling Process // Proceedings of 11th International Conference: "New Knowledges in Sphere of Drilling, Production and Gas Storages"
Pribylina-Podbanské, 2002. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 244879 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Optimisation of Coiled Tubing Drilling Process
Autori
Matanović, Davorin ; Gaurina-Međimurec, Nediljka ; Simon, Katarina
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of 11th International Conference: "New Knowledges in Sphere of Drilling, Production and Gas Storages"
/ - Pribylina-Podbanské, 2002
Skup
11th International Conference: "New Knowledges in Sphere of Drilling, Production and Gas Storages"
Mjesto i datum
Podbanské, Slovačka, 10.2002
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Coiled Tubing; Drilling; Optimisation
Sažetak
The use of coiled tubing in drilling operations in the world is today a normal situation. Through the development of any technology there is a possibility of optimisation. Available coiled tubing diameters have been increased three times and materials quality almost doubled. Through optimisation of unit selection, dimensions and material quality selection it is possible to achieve significant savings in many situations. This paper will point out parameters that determine the optimal choice of coiled tubing, drilling fluid, down hole motor and bit when drilling a well.
Izvorni jezik
Engleski
Znanstvena područja
Rudarstvo, nafta i geološko inženjerstvo