Pregled bibliografske jedinice broj: 242053
Unsteady Flow trough Riverbed caused by Hydroelectric Power Plant Operation
Unsteady Flow trough Riverbed caused by Hydroelectric Power Plant Operation // Research on Hydraulic Engineering / Tedeschi, Stanislav (ur.).
Zagreb: Građevinski institut, Zagreb, 1986. str. 75-86 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 242053 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Unsteady Flow trough Riverbed caused by
Hydroelectric Power Plant Operation
(Unsteady Flow trough Riverbed caused by
Hydroelectric Power Plant)
Autori
Vranješ, Mijo ; Marković, Vesna ; Žugaj, Ranko
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Research on Hydraulic Engineering
/ Tedeschi, Stanislav - Zagreb : Građevinski institut, Zagreb, 1986, 75-86
Skup
2nd Polish - Yugoslav Symposium
Mjesto i datum
Begovo Razdolje, Hrvatska, 22.09.1986. - 25.09.1986
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
positive water wave ; power plant ; canal ; mathematical model
Sažetak
The paper discusses effects of positive water waves in the riverbed, generated by hydroelectric power plant (HEPP) at the tailrace canal during plant startup. The conclusions on water wave propagation have been based on simulation of this phenomenon on mathematical model.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Ustanove:
Građevinski fakultet, Zagreb,
Fakultet građevinarstva, arhitekture i geodezije, Split