Pregled bibliografske jedinice broj: 241698
Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway
Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway // Proceedings of the fib Symposium 2004: "Concrete Structures: the Challenge of Creativity" / Jean-Phillippe Fuzier (ur.).
Avignon: AFGC, 2004. str. 188-190 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 241698 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway
Autori
Sesar, Petar ; Velan, Darinko ; Tkalčić, Damir ; Krečak, Ana
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of the fib Symposium 2004: "Concrete Structures: the Challenge of Creativity"
/ Jean-Phillippe Fuzier - Avignon : AFGC, 2004, 188-190
Skup
Fib Symposium 2004: Concrete Structures: the Challenge of Creativity
Mjesto i datum
Avignon, Francuska, 26.04.2004. - 28.04.2004
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
precast girders; 70 m span; river crossing; full continuity; construction sequence
Sažetak
THe Viaduct Dreznik (2485 m long) across Kupa river and the DObra bridge (550 m long) are made mostly of spans that are 35 m long. At rivers crossings it was necessary to insert spans of double length (70 m) which imposed partially modified construction method.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA