Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 241698

Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway


Sesar, Petar; Velan, Darinko; Tkalčić, Damir; Krečak, Ana
Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway // Proceedings of the fib Symposium 2004: "Concrete Structures: the Challenge of Creativity" / Jean-Phillippe Fuzier (ur.).
Avignon: AFGC, 2004. str. 188-190 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 241698 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway

Autori
Sesar, Petar ; Velan, Darinko ; Tkalčić, Damir ; Krečak, Ana

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
Proceedings of the fib Symposium 2004: "Concrete Structures: the Challenge of Creativity" / Jean-Phillippe Fuzier - Avignon : AFGC, 2004, 188-190

Skup
Fib Symposium 2004: Concrete Structures: the Challenge of Creativity

Mjesto i datum
Avignon, Francuska, 26.04.2004. - 28.04.2004

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
precast girders; 70 m span; river crossing; full continuity; construction sequence

Sažetak
THe Viaduct Dreznik (2485 m long) across Kupa river and the DObra bridge (550 m long) are made mostly of spans that are 35 m long. At rivers crossings it was necessary to insert spans of double length (70 m) which imposed partially modified construction method.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
0110281

Ustanove:
INSTITUT IGH, d.d.

Profili:

Avatar Url Damir Tkalčić (autor)

Avatar Url Petar Sesar (autor)


Citiraj ovu publikaciju:

Sesar, Petar; Velan, Darinko; Tkalčić, Damir; Krečak, Ana
Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway // Proceedings of the fib Symposium 2004: "Concrete Structures: the Challenge of Creativity" / Jean-Phillippe Fuzier (ur.).
Avignon: AFGC, 2004. str. 188-190 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Sesar, P., Velan, D., Tkalčić, D. & Krečak, A. (2004) Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway. U: Jean-Phillippe Fuzier (ur.)Proceedings of the fib Symposium 2004: "Concrete Structures: the Challenge of Creativity".
@article{article, author = {Sesar, Petar and Velan, Darinko and Tkal\v{c}i\'{c}, Damir and Kre\v{c}ak, Ana}, year = {2004}, pages = {188-190}, keywords = {precast girders, 70 m span, river crossing, full continuity, construction sequence}, title = {Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway}, keyword = {precast girders, 70 m span, river crossing, full continuity, construction sequence}, publisher = {AFGC}, publisherplace = {Avignon, Francuska} }
@article{article, author = {Sesar, Petar and Velan, Darinko and Tkal\v{c}i\'{c}, Damir and Kre\v{c}ak, Ana}, year = {2004}, pages = {188-190}, keywords = {precast girders, 70 m span, river crossing, full continuity, construction sequence}, title = {Construction of prestressed structure above Kupa and Dobra rivers on the Zagreb-Rijeka motorway}, keyword = {precast girders, 70 m span, river crossing, full continuity, construction sequence}, publisher = {AFGC}, publisherplace = {Avignon, Francuska} }




Contrast
Increase Font
Decrease Font
Dyslexic Font