Bridges and Tunnels on Highways in Croatia


Radić, Jure; Kolić, Davorin
Bridges and Tunnels on Highways in Croatia // BETONTAG 2004
Beč: Austrian Society for Concrete and Construction Technology, 2004. str. 235-240 (pozvano predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 240713 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Bridges and Tunnels on Highways in Croatia

Autori
Radić, Jure ; Kolić, Davorin

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
BETONTAG 2004 / - Beč : Austrian Society for Concrete and Construction Technology, 2004, 235-240

Skup
Concrete Day 2004

Mjesto i datum
Beč, Austrija, 18.03.2004. - 19.03.2004

Vrsta sudjelovanja
Pozvano predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
bridges; tunnels; motorway

Sažetak
Development of highway network is taking place at the moment in Croatia. The plan is including construction of about 1200 km of new highways that should connect all larger Croatian cities (Dubrovnik, Split, Zadar, Pula, Rijeka, Osijek) with the capital of Republic of Croatia, Zagreb. At the same time this highway network is a part of Transeuropean highway network (TEN). An important part of this project are numerous bridges, tunnels and other structures that are now in construction. Typical solutions for brigdes and tunnels that are constructed on highways are respented further as well as their construction methodology: bridge over river Dobra has continuous hollow box girder of same height, Kamacnik bridge with its continuous hollow box girder with changing height, new bridge over Krka river canyon near Skradin has reinforced concrete arch bridge with the arch span of 210 m and Dubrovnik bridge is a cable-stayed bridge with the main span of 303 m. At the end new plans for the future Pasman bridge with the total length of about 2200 m has been shown as an example which project size is to be expected in the future as part of the national programme of connecting land with islands on Adriatic coast. Beside numerous bridges some major tunnel structures have been designed alogn the highway and the are represented with two biggest tunnel structures as double-tube and double track tunnels Sv. Rok (5.6 km) and Mala Kapela (5.7 km) that are both constructed with conventional drill-and-blast methodology using NATM principles.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
0082219

Ustanove:
Građevinski fakultet, Zagreb

Profili:

Avatar Url Davorin Kolić (autor)

Avatar Url Jure Radić (autor)


Citiraj ovu publikaciju:

Radić, Jure; Kolić, Davorin
Bridges and Tunnels on Highways in Croatia // BETONTAG 2004
Beč: Austrian Society for Concrete and Construction Technology, 2004. str. 235-240 (pozvano predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Radić, J. & Kolić, D. (2004) Bridges and Tunnels on Highways in Croatia. U: BETONTAG 2004.
@article{article, author = {Radi\'{c}, Jure and Koli\'{c}, Davorin}, year = {2004}, pages = {235-240}, keywords = {bridges, tunnels, motorway}, title = {Bridges and Tunnels on Highways in Croatia}, keyword = {bridges, tunnels, motorway}, publisher = {Austrian Society for Concrete and Construction Technology}, publisherplace = {Be\v{c}, Austrija} }
@article{article, author = {Radi\'{c}, Jure and Koli\'{c}, Davorin}, year = {2004}, pages = {235-240}, keywords = {bridges, tunnels, motorway}, title = {Bridges and Tunnels on Highways in Croatia}, keyword = {bridges, tunnels, motorway}, publisher = {Austrian Society for Concrete and Construction Technology}, publisherplace = {Be\v{c}, Austrija} }