Pregled bibliografske jedinice broj: 231232
A method for the long - term scheduling of power system with multiple user reservoirs
A method for the long - term scheduling of power system with multiple user reservoirs // Sustainable Development of Energy, Water and Environment Systems, Volume II / Afgan, Bogdan ; Duić, Guzović (ur.).
Zagreb: Fakultet strojarstva i brodogradnje Sveučilišta u Zagrebu, 2005. str. 139-144
CROSBI ID: 231232 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
A method for the long - term scheduling of power system with multiple user reservoirs
Autori
Sutlović, Elis ; Majstrović , Matislav ; Sarajčev , Ivan
Vrsta, podvrsta i kategorija rada
Poglavlja u knjigama, znanstveni
Knjiga
Sustainable Development of Energy, Water and Environment Systems, Volume II
Urednik/ci
Afgan, Bogdan ; Duić, Guzović
Izdavač
Fakultet strojarstva i brodogradnje Sveučilišta u Zagrebu
Grad
Zagreb
Godina
2005
Raspon stranica
139-144
ISBN
953-6313-69-3
Ključne riječi
Power system, long-term scheduling, multiple user reservoir
Sažetak
This paper presents an optimization-based method for the long-term scheduling of power system with several multiple-user reservoirs. The proposed method maximizes the profit of various types of water utilization taking into account limited water resources and all accomplishable restrictions. Hydroelectric power plants and other water users are treated like a peer participant in the profit realization. The method has been implemented in a computer program and tested on real system.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika
POVEZANOST RADA
Projekti:
0023026
Ustanove:
Fakultet elektrotehnike, strojarstva i brodogradnje, Split