Pregled bibliografske jedinice broj: 224758
Reconstruction of a high clayey railway embankment using piles
Reconstruction of a high clayey railway embankment using piles // Proc. Conf . Soil-Structure interaction: Calculation methods and engineering practice. Sankt Petersburg / Ulitsky V.M. (ur.).
Sankt Peterburg: ASV Publishers, 2005. str. 159 -163 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 224758 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Reconstruction of a high clayey railway embankment using piles
Autori
Goluža, D. ; Vukadinović, Bojan ; Kvasnička, Predrag
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proc. Conf . Soil-Structure interaction: Calculation methods and engineering practice. Sankt Petersburg
/ Ulitsky V.M. - Sankt Peterburg : ASV Publishers, 2005, 159 -163
Skup
Soil-Structure interaction: Calculation methods and engineering practice. Sankt Petersburg
Mjesto i datum
Sankt Peterburg, Ruska Federacija, 26.05.2005. - 28.05.2005
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
railway embankment; reconstruction; stability
Sažetak
This paper describes three possible solutions for reconstructing the railway embankment on the railway line between Zagreb and Rijeka. For this purpose, site investigations and laboratory tests were carried out to obtain characteristic values of parameters necessary for embankment stability calculations. Of the three solutions considered, only the solution involving the use of piles requires no railway traffic disruptions. Therefore, possible pile lengths were analysed to found out that a factor of safety sharply increased as the pile length was increased from 8 up to 12 metres.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo, Rudarstvo, nafta i geološko inženjerstvo