Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 196830

Work and time study in operating several looms


Kovačević, Stana
Work and time study in operating several looms // Melliand international, 11 (2005), 5; 112-116 (podatak o recenziji nije dostupan, članak, znanstveni)


CROSBI ID: 196830 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Work and time study in operating several looms

Autori
Kovačević, Stana

Izvornik
Melliand international (0947-9163) 11 (2005), 5; 112-116

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
looms ; study work and time ; concurrent stoppage ; optimization of weaving machine ; production quota

Sažetak
Operator machine assignment will be optimized by recording operating cycles, their frequencies and duration on different looms and with multiple machine assignments. The impact of operator machine assignment on operator occupation, production quota, and machine efficiency on operating overlap time will be analyzed. An analysis of work and time at a workplace will lead to the operator task in terms of quantity and depending on the influence of the assortment to the operator task in terms of quality as well. Points per product unit will be determined according to the systematization of workplaces, as well as quantitative and qualitative performances of the operator.

Izvorni jezik
Engleski

Znanstvena područja
Tekstilna tehnologija



POVEZANOST RADA


Projekti:
0117008

Ustanove:
Tekstilno-tehnološki fakultet, Zagreb

Profili:

Avatar Url Stana Kovačević (autor)


Citiraj ovu publikaciju:

Kovačević, Stana
Work and time study in operating several looms // Melliand international, 11 (2005), 5; 112-116 (podatak o recenziji nije dostupan, članak, znanstveni)
Kovačević, S. (2005) Work and time study in operating several looms. Melliand international, 11 (5), 112-116.
@article{article, author = {Kova\v{c}evi\'{c}, Stana}, year = {2005}, pages = {112-116}, keywords = {looms, study work and time, concurrent stoppage, optimization of weaving machine, production quota}, journal = {Melliand international}, volume = {11}, number = {5}, issn = {0947-9163}, title = {Work and time study in operating several looms}, keyword = {looms, study work and time, concurrent stoppage, optimization of weaving machine, production quota} }
@article{article, author = {Kova\v{c}evi\'{c}, Stana}, year = {2005}, pages = {112-116}, keywords = {looms, study work and time, concurrent stoppage, optimization of weaving machine, production quota}, journal = {Melliand international}, volume = {11}, number = {5}, issn = {0947-9163}, title = {Work and time study in operating several looms}, keyword = {looms, study work and time, concurrent stoppage, optimization of weaving machine, production quota} }

Časopis indeksira:


  • Scopus





Contrast
Increase Font
Decrease Font
Dyslexic Font