EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY


Inal, Fulya; Radujković, Mladen
EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY // Proceedings of 3rd Scientific Conference on Project Management, “ ; Clustering in Construction Project Management” ; / Pantouvakis, J.P. (ur.).
Solun, 2004. str. 308-315 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 179692 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY

Autori
Inal, Fulya ; Radujković, Mladen

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
Proceedings of 3rd Scientific Conference on Project Management, &#8220 ; Clustering in Construction Project Management&#8221 ; / Pantouvakis, J.P. - Solun, 2004, 308-315

Skup
3rd Scientific Conference on Project Management, &#8220 ; Clustering in Construction Project Management&#8221 ;

Mjesto i datum
Solun, Grčka, 24.09.2004. - 25.09.2004

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Construction management; Construction equipment; equipment performance; equipment cost; motorway construction

Sažetak
The Cat 990 Loader is a high capacity equipment and very efficient for motorway construction earthworks. However, owning and operating cost is very high. Therefore, its operating and effective usage must be tracked closely not only from a production point of view but also from an investment point of view. In a selected project, the Cat 990-loader production performance during one-month period was monitored. 990-loader production performance calculated and compared for each crew. As a result it is seen that 990 loader production efficiencies varies between each crew and average efficiency 76% is low compared to the planned theoretical production rate. The reasons for low efficiency and different production efficiency between crews are investigated and stated as idle time, down time, work location, night or day shift, haulage road and managerial factors. It can be said that the findings of this study will be helpful for project managers in motorway construction.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
0082208

Ustanove:
Građevinski fakultet, Zagreb

Profili:

Avatar Url Mladen Radujković (autor)


Citiraj ovu publikaciju:

Inal, Fulya; Radujković, Mladen
EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY // Proceedings of 3rd Scientific Conference on Project Management, “ ; Clustering in Construction Project Management” ; / Pantouvakis, J.P. (ur.).
Solun, 2004. str. 308-315 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Inal, F. & Radujković, M. (2004) EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY. U: Pantouvakis, J. (ur.)Proceedings of 3rd Scientific Conference on Project Management, “ ; Clustering in Construction Project Management” ;.
@article{article, author = {Inal, Fulya and Radujkovi\'{c}, Mladen}, editor = {Pantouvakis, J.}, year = {2004}, pages = {308-315}, keywords = {Construction management, Construction equipment, equipment performance, equipment cost, motorway construction}, title = {EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY}, keyword = {Construction management, Construction equipment, equipment performance, equipment cost, motorway construction}, publisherplace = {Solun, Gr\v{c}ka} }
@article{article, author = {Inal, Fulya and Radujkovi\'{c}, Mladen}, editor = {Pantouvakis, J.}, year = {2004}, pages = {308-315}, keywords = {Construction management, Construction equipment, equipment performance, equipment cost, motorway construction}, title = {EARTHMOVING EQUIPMENT PRODUCTION EFFICIENCY}, keyword = {Construction management, Construction equipment, equipment performance, equipment cost, motorway construction}, publisherplace = {Solun, Gr\v{c}ka} }




Contrast
Increase Font
Decrease Font
Dyslexic Font