A generic approach to minimising whole life costs in the building industry
A generic approach to minimising whole life costs in the building industry, 2004., doktorska disertacija, Faculty of Civil Engineering, Dundee, Great Britain
CROSBI ID: 165757 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
A generic approach to minimising whole life costs in the building industry
Autori
Marenjak, Saša
Vrsta, podvrsta i kategorija rada
Ocjenski radovi, doktorska disertacija
Fakultet
Faculty of Civil Engineering
Mjesto
Dundee, Great Britain
Datum
17.01
Godina
2004
Stranica
280
Mentor
Horner, Malcolm R.
Ključne riječi
Whole Life Costs (WLC) ; Integrated Logistic Support (ILS) ; Mathematical and implementation models ; maintenance and operating costs ; minimisation.
Sažetak
Historically, clients have been interested in minimising initial construction costs. In the last few decades building users have begun to discover that the maintenance and operating costs impact significantly on Whole Life Costs (WLC) over the life of buildings. In this thesis a generic comprehensive WLC data breakdown structure and Structured Framework for Estimation (SFE) of WLC for the building industry are presented. A developed WLC mathematical model is presented which allows the estimation and trade-off of WLC at the lowest level of detail (e.g. elements and/or components and resource level). A WLC implementation model is presented which embodies the “ theory of significance” in order to simplify the procedure for estimation of WLC, focusing only on identified WLC significant elements thus reducing the effort involved in data collection and analysis. The WLC implementation model also embodies the application of Failure Mode and Effects Analysis (FMEA) and Reliability Centred Maintenance (RCM) techniques in order to identify the most applicable and cost effective maintenance tasks to minimise the WLC of building elements. WLC mathematical and implementation models are applied to three different types of projects (high school, housing scheme and prison) with the objective of demonstrating the minimisation of WLC and, at the same time, satisfying certain performance requirements. The WLC implementation model provides the guidelines for the implementation of WLC estimation and defines the way for the minimisation of WLC, satisfying the identified client’ s and certain performance requirements. Further validation (improvement) of the developed predictive WLC model and recommendations for future research are suggested.