Pregled bibliografske jedinice broj: 155591
Projekt zaštite građevne jame za polaganje cjevovoda
Projekt zaštite građevne jame za polaganje cjevovoda, 2002., diplomski rad, Građevinski fakultet, Split
CROSBI ID: 155591 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Projekt zaštite građevne jame za polaganje cjevovoda
(Cofferdam for pipeline excavation)
Autori
Abramović, Nikica
Vrsta, podvrsta i kategorija rada
Ocjenski radovi, diplomski rad
Fakultet
Građevinski fakultet
Mjesto
Split
Datum
14.11
Godina
2002
Stranica
92
Mentor
Miščević, Predrag
Ključne riječi
geotehnika; rov; cjevovod; zaštita
(geotechnique; sheet piled excavation; pipe line; protection)
Sažetak
It is necessary to make the protection project for the foundation pit in order to construct the pipeline 0 1000 mm. It's necessary to find out all the forces whose are affecting on sheet pile ( in this case, on "I" beam ) and estimate it with satisfactory safety. Sheet pile dimensioned by Blumm method has been chosen on the basis of calculation as construction solution. We build interlocking pile with strut. The construtive pit is protected by partitionwall steel made elements "Larssen and Rombas" type.
Izvorni jezik
Hrvatski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Projekti:
0083132
Ustanove:
Fakultet građevinarstva, arhitekture i geodezije, Split
Profili:
Predrag Miščević
(mentor)