Asynchronous Operation Of Hydro-Generator-Calculation Verification By Tests On Old Hydro-Generator In Power Plant
Asynchronous Operation Of Hydro-Generator-Calculation Verification By Tests On Old Hydro-Generator In Power Plant // Proceedings of MELECON 2004
Zagreb, 2004. str. 1121-1124 (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 149680 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Asynchronous Operation Of Hydro-Generator-Calculation Verification By Tests On Old Hydro-Generator In Power Plant
Autori
Zebić, Željko ; Maljković, Zlatko ; Pavlica, Milutin
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of MELECON 2004
/ - Zagreb, 2004, 1121-1124
Skup
The 12th IEEE Mediterranean Electrotechnical Conference
Mjesto i datum
Dubrovnik, Hrvatska, 12.05.2004. - 15.05.2004
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Asynchronous operation; hydrogenerator
Sažetak
The extended testing of hydro-generator (rated 35 MVA) was made because the generators working age expired and it was going to be replaced with new one. This was the perfect oportunity to do some specific and not usual testing. The complicated testing plan was designed in order to enable recording as much relevant data as possible (electrical, electromechanical, mechanical). Therefore in some phases of testing, 29 to 44 quantities were measured simultaneously. Further, the results of measuring and simulation for asynchronous operation of synchronous generator are shown.