Pregled bibliografske jedinice broj: 142318

Asynchronous Start Of Large Unit In Pumped Storage Hpp "Čapljina" In Present Power System Of Bosnia And Herzegovina


Rusanov, Nikola; Vučina, Srećko; Stojsavljević, Milan; Nemec, Darko
Asynchronous Start Of Large Unit In Pumped Storage Hpp "Čapljina" In Present Power System Of Bosnia And Herzegovina // Med Power 2002 3rd Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion / Hatziargyriou, N ; Braunstein, A ; Theopanus, A (ur.).
Atena: IEE Hellas, National Technical University of Athens, 2002. str. 223-223 (sažetak u Proceedings) (poster, međunarodna recenzija, cjeloviti rad (in extenso), stručni)


CROSBI ID: 142318 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Asynchronous Start Of Large Unit In Pumped Storage Hpp "Čapljina" In Present Power System Of Bosnia And Herzegovina

Autori
Rusanov, Nikola ; Vučina, Srećko ; Stojsavljević, Milan ; Nemec, Darko

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), stručni

Izvornik
Med Power 2002 3rd Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion / Hatziargyriou, N ; Braunstein, A ; Theopanus, A - Atena : IEE Hellas, National Technical University of Athens, 2002, 223-223 (sažetak u Proceedings)

Skup
3rd Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion

Mjesto i datum
Atena, Grčka, 04.11.2002. - 06.11.2002

Vrsta sudjelovanja
Poster

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
pumped-storage hydro power plant; asynchronous start;

Sažetak
According to the project POWER III, the rehabilitation of the power system of Bosnia and Herzegovina (BiH) and its reconnection with Croatian power system will be finish by the end of 2005. Use of available resources under constraints imposed by actual and prospective states of the power systems of BiH and Croatia (particularly Adriatic lines) leads to operational problems: violation of (n-1) criteria, high voltages, voltage instability, thermal power plants (TPPs) operating below minimum, etc. Having outstanding capabilities, pumped storage HPP Čapljina (2x240 MVA) could contribute to mitigating some of those problems while fully exploiting its advantages on the open electricity market. Two system services should be provided for HPP Čapljina: asynchronous start (with and/or without phase reactors at the generator star point) and transmission capacity for pumping. To find out if these services are available before rehabilitation of the power system a study was done and results are outlined in this paper. Regarding voltage / reactive power dynamics, asynchronous start of units at HPP Čapljina with phase reactors is possible, but reactive capability of nearby generators is fully used. With the other machine at HPP Čapljina operating as generator voltage/reactive power conditions in this part of the system are significantly improved. Two variants of supplying power for pumping were considered, from TPPs in BiH and from UCTE. In the latter case the constraint is violation of the (n-1) criterion for Adriatic lines in the Croatian power system.

Izvorni jezik
Engleski

Znanstvena područja
Elektrotehnika



POVEZANOST RADA


Projekti:
0084001

Profili:

Avatar Url Darko Nemec (autor)

Avatar Url Milan Stojsavljević (autor)

Poveznice na cjeloviti tekst rada:

Pristup cjelovitom tekstu rada

Citiraj ovu publikaciju:

Rusanov, Nikola; Vučina, Srećko; Stojsavljević, Milan; Nemec, Darko
Asynchronous Start Of Large Unit In Pumped Storage Hpp "Čapljina" In Present Power System Of Bosnia And Herzegovina // Med Power 2002 3rd Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion / Hatziargyriou, N ; Braunstein, A ; Theopanus, A (ur.).
Atena: IEE Hellas, National Technical University of Athens, 2002. str. 223-223 (sažetak u Proceedings) (poster, međunarodna recenzija, cjeloviti rad (in extenso), stručni)
Rusanov, N., Vučina, S., Stojsavljević, M. & Nemec, D. (2002) Asynchronous Start Of Large Unit In Pumped Storage Hpp "Čapljina" In Present Power System Of Bosnia And Herzegovina. U: Hatziargyriou, N., Braunstein, A. & Theopanus, A. (ur.)Med Power 2002 3rd Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion.
@article{article, author = {Rusanov, Nikola and Vu\v{c}ina, Sre\'{c}ko and Stojsavljevi\'{c}, Milan and Nemec, Darko}, year = {2002}, pages = {223-223 (sa\v{z}etak u Proceedings)}, keywords = {pumped-storage hydro power plant, asynchronous start, }, title = {Asynchronous Start Of Large Unit In Pumped Storage Hpp "\v{C}apljina" In Present Power System Of Bosnia And Herzegovina}, keyword = {pumped-storage hydro power plant, asynchronous start, }, publisher = {IEE Hellas, National Technical University of Athens}, publisherplace = {Atena, Gr\v{c}ka} }
@article{article, author = {Rusanov, Nikola and Vu\v{c}ina, Sre\'{c}ko and Stojsavljevi\'{c}, Milan and Nemec, Darko}, year = {2002}, pages = {223-223 (sa\v{z}etak u Proceedings)}, keywords = {pumped-storage hydro power plant, asynchronous start, }, title = {Asynchronous Start Of Large Unit In Pumped Storage Hpp "\v{C}apljina" In Present Power System Of Bosnia And Herzegovina}, keyword = {pumped-storage hydro power plant, asynchronous start, }, publisher = {IEE Hellas, National Technical University of Athens}, publisherplace = {Atena, Gr\v{c}ka} }




Contrast
Increase Font
Decrease Font
Dyslexic Font