Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 137211

Bridge across Rijeka Dubrovačka


Radić, Jure; Šavor, Zlatko; Hrelja, Gordana; Puž, Goran
Bridge across Rijeka Dubrovačka // NEW DIMENSIONS IN BRIDGES / Chie, Lim, Ewe ; Tandon, M.C. ; Othman, Ismail (ur.).
Singapur: CI-Premier, 2003. str. 333-340 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), stručni)


CROSBI ID: 137211 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Bridge across Rijeka Dubrovačka

Autori
Radić, Jure ; Šavor, Zlatko ; Hrelja, Gordana ; Puž, Goran

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), stručni

Izvornik
NEW DIMENSIONS IN BRIDGES / Chie, Lim, Ewe ; Tandon, M.C. ; Othman, Ismail - Singapur : CI-Premier, 2003, 333-340

Skup
3rd International Conference on NEW DIMENSIONS IN BRIDGES

Mjesto i datum
Singapur, 09.04.2003. - 10.04.2003

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
zavješeni most; prednapeti sklop; projektiranje mosta
(cable-stayed bridge; prestressed superstructure; bridge design)

Sažetak
The design of the bridge across the Rijeka dubrovačka in Croatia is presented. The adopted bridge lay-out comprises the 87, 4 m span box type prestressed concrete approach viaduct with the 60 m cantilever and the 244 + 80, 7 m cable-stayed bridge with composite superstructure. The location of the bridge is in a highly active seismic zone and subject to very strong winds, which strongly influenced the design. The longitudinal layout of the cables is of modified fan type with partial suspension. Cable - stays in two inclined planes are spaced at 20 m. The main bridge superstructure is encastred into the east bank abutment, with 9 pairs of cable - stays anchored in this abutment. The approach viaduct is partially curved in plan. The superstructure depth varies from 3, 2 m at the west bank abutment and at the cantilever end to 8, 2 m at the fixed connection to the pier. Two hydraulic dampers of 2000 tons capacity are installed at the connection of the viaduct to the west bank abutment. The pier base is designed to act as plastic hinge in case of a major earthquake. The Bridge was opened for traffic in May 2002.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
0082219

Ustanove:
Građevinski fakultet, Zagreb


Citiraj ovu publikaciju:

Radić, Jure; Šavor, Zlatko; Hrelja, Gordana; Puž, Goran
Bridge across Rijeka Dubrovačka // NEW DIMENSIONS IN BRIDGES / Chie, Lim, Ewe ; Tandon, M.C. ; Othman, Ismail (ur.).
Singapur: CI-Premier, 2003. str. 333-340 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), stručni)
Radić, J., Šavor, Z., Hrelja, G. & Puž, G. (2003) Bridge across Rijeka Dubrovačka. U: Chie, Lim, Ewe, Tandon, M. & Othman, I. (ur.)NEW DIMENSIONS IN BRIDGES.
@article{article, author = {Radi\'{c}, Jure and \v{S}avor, Zlatko and Hrelja, Gordana and Pu\v{z}, Goran}, year = {2003}, pages = {333-340}, keywords = {zavje\v{s}eni most, prednapeti sklop, projektiranje mosta}, title = {Bridge across Rijeka Dubrova\v{c}ka}, keyword = {zavje\v{s}eni most, prednapeti sklop, projektiranje mosta}, publisher = {CI-Premier}, publisherplace = {Singapur} }
@article{article, author = {Radi\'{c}, Jure and \v{S}avor, Zlatko and Hrelja, Gordana and Pu\v{z}, Goran}, year = {2003}, pages = {333-340}, keywords = {cable-stayed bridge, prestressed superstructure, bridge design}, title = {Bridge across Rijeka Dubrova\v{c}ka}, keyword = {cable-stayed bridge, prestressed superstructure, bridge design}, publisher = {CI-Premier}, publisherplace = {Singapur} }




Contrast
Increase Font
Decrease Font
Dyslexic Font