Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem


Šorić, Kristina; Vojvodić Rosenzweig, Višnja; Lukač, Zrinka
Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem // 5th EURO/INFORMS Joint International Meeting / Gulay Barbarosoglu (ur.).
Istanbul, 2003. (predavanje, međunarodna recenzija, sažetak, znanstveni)


CROSBI ID: 134642 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem

Autori
Šorić, Kristina ; Vojvodić Rosenzweig, Višnja ; Lukač, Zrinka

Vrsta, podvrsta i kategorija rada
Sažeci sa skupova, sažetak, znanstveni

Izvornik
5th EURO/INFORMS Joint International Meeting / Gulay Barbarosoglu - Istanbul, 2003

Skup
5th EURO/INFORMS Joint International Meeting

Mjesto i datum
Istanbul, Turska, 06.07.2003. - 10.07.2003

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Lot sizing problem; equipment replacement; bilevel programming; heuristics

Sažetak
The object of a Production Lot Sizing Problem is to minimize the sum of the costs of production, storage and set up. On the other hand, an Equipment Replacement Problem concerns a machine which deteriorates with age and the decision to replace it. The object is to decide when to replace the machine in order to maximize the utility of operating it. We introduce the hierarchy into the problem, and model the problem as the new bilevel mixed 0-1 integer programming problem called Bilevel Lot Sizing Problem with Equipment Replacement. We develop heuristics based on tabu search for solving the problem.

Izvorni jezik
Engleski

Znanstvena područja
Matematika



POVEZANOST RADA


Projekti:
0067019

Ustanove:
Ekonomski fakultet, Zagreb


Citiraj ovu publikaciju:

Šorić, Kristina; Vojvodić Rosenzweig, Višnja; Lukač, Zrinka
Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem // 5th EURO/INFORMS Joint International Meeting / Gulay Barbarosoglu (ur.).
Istanbul, 2003. (predavanje, međunarodna recenzija, sažetak, znanstveni)
Šorić, K., Vojvodić Rosenzweig, V. & Lukač, Z. (2003) Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem. U: Gulay Barbarosoglu (ur.)5th EURO/INFORMS Joint International Meeting.
@article{article, author = {\v{S}ori\'{c}, Kristina and Vojvodi\'{c} Rosenzweig, Vi\v{s}nja and Luka\v{c}, Zrinka}, year = {2003}, pages = {189}, keywords = {Lot sizing problem, equipment replacement, bilevel programming, heuristics}, title = {Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem}, keyword = {Lot sizing problem, equipment replacement, bilevel programming, heuristics}, publisherplace = {Istanbul, Turska} }
@article{article, author = {\v{S}ori\'{c}, Kristina and Vojvodi\'{c} Rosenzweig, Vi\v{s}nja and Luka\v{c}, Zrinka}, year = {2003}, pages = {189}, keywords = {Lot sizing problem, equipment replacement, bilevel programming, heuristics}, title = {Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem}, keyword = {Lot sizing problem, equipment replacement, bilevel programming, heuristics}, publisherplace = {Istanbul, Turska} }




Contrast
Increase Font
Decrease Font
Dyslexic Font